Construction & Commissioning

We offer Construction, Commissioning, and Start-up management services which takes Engineering and Procurement to a conclusion, with our processes and teams ensuring adherence to project specifications and quality standards. Our installation teams provide end-to-end management services, encompassing cable, power, control & instrumentation cabling, panel installation. Our commissioning and start-up services include system turnover, checkout, testing, certification, calibration, safety validation, and site acceptance testing, all led and executed by our experienced engineers.

  • 182projects executed
  • 907199person hours
  • 33892885contracts value ($)

Here’s why you should choose us

At Abalto, we specialise in the intricate demands of construction and commissioning project phases. Our services cover construction management, ensuring precise site execution and alignment with project goals. Our experienced team manages site construction, expertly translating engineering drawings into reality. In commissioning, we excel in management, planning, systemisation, and completion, guaranteeing optimal system performance. Our meticulous pre-start-up checks and audits ensure compliance, setting the stage for a successful start-up. We mastermind start-up activities and optimise processes for efficiency. Our comprehensive as-built documentation captures project details for future maintenance and upgrades. Choose Abalto for effortless construction and commissioning services with timely start-ups.

01. Construction Management Download

Abalto offers a comprehensive approach to Construction Management Services, guiding every aspect of your EPC project. We meticulously plan and schedule activities, manage resources effectively, and ensure the timely delivery of materials and equipment. Collaborating closely with contractors and subcontractors, we maintain the highest construction standards through rigorous quality control measures and risk management strategies. Adherence to safety and environmental regulations is paramount, and we provide transparent progress reports to stakeholders. From project planning to commissioning and start-up support for Electrical, Control, Instrumentation, and Automation Systems, Abalto is your trusted partner for successful EPC project construction management, ensuring efficiency and compliance.

Choosing Abalto offers a range of advantages

Elevate your EPC project’s success with Abalto’s Construction Management Services for your project requirements and discover how our expertise can contribute to the seamless site execution of your Electrical, Control, Instrumentation, and Automation Systems.

Expertise and Experience

Our experienced team brings deep expertise in construction management, ensuring your project is in capable hands.

Comprehensive Approach

We cover every aspect of construction, from planning to commissioning, to deliver a complete and successful project.

Industry Standards Adherence

We strictly adhere to industry standards, regulations, and best practices to ensure quality and compliance.

Efficiency and Cost Savings

Our strategic management approach optimises resources and minimises costs, delivering value for your investment. We optimise the resources to available work fronts on a daily basis.

Transparency and Communication

We maintain open communication with clients, keeping them informed at every stage of the project.

Proven Track Record

Abalto has a history of successfully managing EPC projects across diverse industries, showcasing our capabilities.

View Projects

Filter projects by:

  • Secondary Service
  • Industry
  • Client
  • Status
  • ApplyReset

Sort projects by:

  • 16projects executed
  • 495470person hours
  • 15782403contracts value ($)

Salalah Methanol Electrical, Instrumentation & Telecom E&F Area

Construction & CommissioningJun 2019
Salalah liquefied petroleum gas (SLPG) project is being developed in Dhofar, southern Oman, by Oman

AOTC Instrument Technicians for OQ LPG Project

Construction & CommissioningJun 2021
Manpower supply for Construction & Commissioning

SNC Manpower

Construction & CommissioningMay 2021
Manpower supply for Construction, Commissioning & Start-up

Modernization of Control Room

Construction & Commissioning, Detailed Design & EngineeringSep 2020
Design, Engineering, demolition, installation, commissioning & startup with parallel operations for

E&I for Salalah Methanol and Ammonia Plant

Construction & CommissioningApr 2020
Manpower supply for Construction & Commissioning

Yibal Khuff E&I On Plot

Construction & CommissioningSep 2019
Manpower supply for Construction & Commissioning

PDO Birba Changeover Site Activities

Construction & CommissioningMay 2018
PDO decided to upgrade the old Birba Cluster and started with a FEED and Detailed Design done by Aba

Salalah Methanol Company Control Room Upgrade Phase 1

Construction & CommissioningMay 2018
Installation of Control & Automation System for SMC new control room including Lighting, Desks, Cabl

PDO Marmul Central Control Room Construction Support Services

Construction & CommissioningOct 2017
Building a modern new Marmul Central Control Room to be the central control location for all marmul

PDO Marmul Central Control Room Construction Support Services

Construction & CommissioningOct 2017
Building a modern new Marmul Central Control Room to be the central control location for all marmul

PDO SNCP Commissioning C&I Team

Construction & CommissioningJun 2017
The Saih Nihayda condensate stabilization plant will be built near the Saih Nihayda gas plant in the

ORPIC Aromatics Control Room Shutdown

Construction & CommissioningFeb 2017
Relocate 4 control panels including the addition of junction boxes and extension power and instrumen

ORPIC Sohar Refinery Improvement Project (SRIP) Package 3 & 5 C&I Construction & Commissioning

Construction & CommissioningNov 2015
The Sohar Refinery Improvement Project (SRIP) is a multi-billion dollar project for Oman Oil Refiner

CCED Saiwan Engineering Services

Construction & Commissioning, ImplementationNov 2011
The project was split into an Early Development Facility where long term production testing can be i

Bromborough Waste Water Treatment Works Control & Automation System

Construction & Commissioning, Detailed Design & EngineeringFeb 1999
This was a project to design & develop an end to end systems and software solution for the Bromborou

TheatreTech China Control & Automation System

Construction & Commissioning, Detailed Design & EngineeringFeb 1989
A project to complete the construction and commissioning for 2 performing arts theatres in Shenzhen

02. Site Construction Download

Abalto offers Site Construction Resources services for EPC Projects, featuring a skilled workforce adept in electrical, control, instrumentation, and automation. Safety is paramount, with strict adherence to your health and safety protocols , ensuring a secure work environment. Your quality control measures are uphold rigorously to standards in every installation. Your equipment and tools are managed effectively, preventing project delays. We prioritise clear documentation, fostering project accountability, and our supervisors oversee activities, resolving issues and ensuring milestones are met. Abalto’s precise execution of control and automation system activities, including inspections and compliance, ensures seamless integration in diverse industrial environments, guaranteeing project success.

Choosing Abalto offers a range of advantages

In EPC projects, successful integration of facilities for Electrical, Control, Instrumentation, and Automation systems goes hand-in-hand with effective construction management. We recognise that the construction is a critical phase can make or break the project timeline.

Project delays often stem from coordination challenges between construction and systems integration teams. To address this, efficient construction management and skilled construction teams are essential to execute and deliver to project specifications and quality.

Utilise Abalto in your EPC project’s construction phase for expert construction management services and discover how our construction expertise can contribute to your project’s success.

Our Expertise

We’ve collaborated with clients in the oil & gas and energy sectors, providing a comprehensive array of installation and construction services. Our construction projects adhere to client-approved standards and are meticulously installed and validated to meet rigorous industry requirements.

Vast Experience in Site Construction

Our track record spans diverse site environments, including challenging offshore locations. We attribute our construction success to thorough planning, resource allocation, and effective management. While we plan extensively, we’re also prepared for the unexpected, responding with flexibility and resourcefulness when faced with on-site challenges.

Construction Supervision Services

Our Construction Supervision service is tailored to assist construction contractors in areas where they may need reinforcement, such as area completion focus. We set up tasks and targets for construction supervisors and technician teams, encompassing safety practices, QC, interface management, and milestone targets. Through effective construction planning, we ensure timely delivery of project sub-milestones while optimising available resources.

Comprehensive Installation

From Control Rooms to Instrumentation and Equipment, and from Control Rooms to Plant Management Systems via Industrial Networks, our site installation crews and Instrument Technicians work in alliance with Owners, EPCs, and Vendors to ensure seamless integration and successful installation.

Rigorous Inspection

We take quality seriously. Our preparation of Inspection Test Records for Quality Assurance / Quality Control (QA/QC) aligns with Owner and EPC inspection requirements. Our internal inspectors ensure compliance with rigorous project standards and regulations before external inspection, eliminating re-work and ensuring a smooth process.

Achieving Mechanical Completion

Our ultimate goal is to attain Mechanical Completion Certification for each sub-system, aligning with EPC Mechanical Completion Milestones. We’re no strangers to the challenges of achieving this milestone, and our experience positions us to overcome obstacles with efficiency and precision.

View Projects

Filter projects by:

  • Secondary Service
  • Industry
  • Client
  • Status
  • ApplyReset

Sort projects by:

  • 21projects executed
  • 455730person hours
  • 13925543contracts value ($)

Salalah Methanol Electrical, Instrumentation & Telecom E&F Area

Construction & CommissioningJun 2019
Salalah liquefied petroleum gas (SLPG) project is being developed in Dhofar, southern Oman, by Oman

AOTC Instrument Technicians for OQ LPG Project

Construction & CommissioningJun 2021
Manpower supply for Construction & Commissioning

SNC Manpower

Construction & CommissioningMay 2021
Manpower supply for Construction, Commissioning & Start-up

Modernization of Control Room

Construction & Commissioning, Detailed Design & EngineeringSep 2020
Design, Engineering, demolition, installation, commissioning & startup with parallel operations for

E&I for Salalah Methanol and Ammonia Plant

Construction & CommissioningApr 2020
Manpower supply for Construction & Commissioning

Yibal Khuff E&I On Plot

Construction & CommissioningSep 2019
Manpower supply for Construction & Commissioning

SLPG Manpower Supply

Construction & CommissioningAug 2019
Manpower supply for commissioning

PDO Birba Changeover Site Activities

Construction & CommissioningMay 2018
PDO decided to upgrade the old Birba Cluster and started with a FEED and Detailed Design done by Aba

Salalah Methanol Company Control Room Upgrade Phase 1

Construction & CommissioningMay 2018
Installation of Control & Automation System for SMC new control room including Lighting, Desks, Cabl

PDO Marmul Central Control Room Construction Support Services

Construction & CommissioningOct 2017
Building a modern new Marmul Central Control Room to be the central control location for all marmul

PDO Marmul Central Control Room Construction Support Services

Construction & CommissioningOct 2017
Building a modern new Marmul Central Control Room to be the central control location for all marmul

PDO SNCP Commissioning C&I Team

Construction & CommissioningJun 2017
The Saih Nihayda condensate stabilization plant will be built near the Saih Nihayda gas plant in the

BP Khazan CPF Commissioning C&I Team

Construction & CommissioningMay 2017
Located on a previously undeveloped desert site 350 kilometres south of Muscat, work on the Khazzan

ORPIC Aromatics Control Room Shutdown

Construction & CommissioningFeb 2017
Relocate 4 control panels including the addition of junction boxes and extension power and instrumen

ORPIC Sohar Refinery Improvement Project (SRIP) Package 3 & 5 C&I Construction & Commissioning

Construction & CommissioningNov 2015
The Sohar Refinery Improvement Project (SRIP) is a multi-billion dollar project for Oman Oil Refiner

Qatar Shell Pearl GTL PAS & ENMCS Systems Upgrade

Construction & Commissioning, Detailed Design & EngineeringSep 2015
Download all project logic, conduct conversions to new firmware software revisions, validate and upl

PDO DACA Cyber Security Upgrades

Construction & Commissioning, Consultancy, Detailed Design & EngineeringJun 2013
Follow PDO specific DCADA System Hardening measures for all Control Systems Servers, Operator and En

Pernton & Newton SatCon Control System Communication Interfaces Modifications

Construction & Commissioning, Detailed Design & EngineeringMay 2002
Modifications to PLC control system communication module to send equipment status to SCADA

Replacement of Paint Spray Booth Baffles

Construction & CommissioningMar 2002
Replacement of Paint Spray Booth Baffles and modifications to Control System including air flow moni

Skid Body Transport to Storage Upgrades

Construction & Commissioning, Detailed Design & EngineeringFeb 2002
Modifications to control system for Skid Body Transport to Storage including counting, Skid Identifi

Relocate Hoist Rail & Control System

Construction & Commissioning, Detailed Design & EngineeringJan 2002
Modifications to the controls for relocation of Hoist Rail Transport System including safety interlo

03. Commissioning Management Download

Abalto’s Commissioning Management services are a cornerstone of seamless project flawless start-up and operational readiness. Our meticulous timeline encompasses critical steps, beginning with the verification of construction completion certificates and establishing milestones for completions, pre-commissioning, and commissioning. We craft a comprehensive commissioning philosophy and logical sequencing with key milestones.

In achieving efficiency and project objectives, the early integration of our commissioning experts into client teams is crucial. Our integrated Commissioning Consulting services offer a fully integrated service package where we prioritise schedule, mitigate time, cost, and project risk, enhancing efficiency and ensuring flawless project start-ups. With a detailed commissioning plan, roles, responsibilities, and risk mitigation, our meticulous approach guarantees a successful project outcome.

Choosing Abalto offers a range of advantages

Reach out to us to explore how our Commissioning Management services can be the catalyst for achieving your project’s success.

In cases where projects deviate from the original schedule, and recovery is necessary, a Commissioning Audit and review becomes essential. A logical and impartial project review is conducted against predefined checks, followed by an analysis of results. This culminates in a detailed report to pinpoint issues and suggest corrective actions for effective recovery.

Our comprehensive commissioning services ensure that systems adhere to industry design codes and project specifications, with cleanliness, dryness, inertness, and leak-free characteristics.

Our experienced professionals collaborate with clients to tackle challenges throughout the process, from construction to start-up. We provide a single-point contact for contract administration, minimize headcount, optimize the utilization of specialty equipment, reduce mobilization costs, and refine work schedules.

Our time-experienced engineering consultants conduct a Fresh Eyes Audit, scrutinising, analysing, and compiling detailed reports. This process helps identify problems and offers recommendations for corrective and recovery actions, covering aspects like project objectives, design and procurement status, construction progress, inspection and testing statuses, pre-commissioning and commissioning logic, and resource loading.

We are confident in our ability to deliver:

  • Improved Schedule Accuracy
  • Optimised Resource Allocation
  • Smoother Inspection & Testing Processes
  • Accelerated Start-up Timelines
  • Reduced Costs
  • Enhanced Efficiency
  • Optimised Equipment Performance

View Projects

Filter projects by:

  • Secondary Service
  • Industry
  • Client
  • Status
  • ApplyReset

Sort projects by:

  • 42projects executed
  • 586020person hours
  • 20679378contracts value ($)

Salalah Methanol Electrical, Instrumentation & Telecom E&F Area

Construction & CommissioningJun 2019
Salalah liquefied petroleum gas (SLPG) project is being developed in Dhofar, southern Oman, by Oman

Senior Commissioning Engineer

Construction & CommissioningAug 2022
Provision of Senior Commissioning Engineer

Daleel Commissioning Engineer

Construction & CommissioningJun 2021
Commissioning engineer services of additional separation project

AOTC Instrument Technicians for OQ LPG Project

Construction & CommissioningJun 2021
Manpower supply for Construction & Commissioning

SNC Manpower

Construction & CommissioningMay 2021
Manpower supply for Construction, Commissioning & Start-up

Daleel Commissioning Engineer

Construction & Commissioning, Detailed Design & EngineeringNov 2020
DPS AP/LP Flare Replacement Project Commissioning Support

Modernization of Control Room

Construction & Commissioning, Detailed Design & EngineeringSep 2020
Design, Engineering, demolition, installation, commissioning & startup with parallel operations for

Oman LNG Systemisation

Construction & Commissioning, Detailed Design & EngineeringMay 2020
Preparation of Commissioning & Startup deliverables including Procedures, Plans and completions.

E&I for Salalah Methanol and Ammonia Plant

Construction & CommissioningApr 2020
Manpower supply for Construction & Commissioning

PDO MOV replacement project

Construction & CommissioningApr 2020
RLMU MOV Replacement

Yibal Khuff E&I On Plot

Construction & CommissioningSep 2019
Manpower supply for Construction & Commissioning

SLPG Manpower Supply

Construction & CommissioningAug 2019
Manpower supply for commissioning

PDO Birba Changeover Site Activities

Construction & CommissioningMay 2018
PDO decided to upgrade the old Birba Cluster and started with a FEED and Detailed Design done by Aba

Salalah IPP Metering Stations

Construction & CommissioningAug 2017
Preparation of project specific Commissioning Procedures following OGC Commissioning & Start-up Proc

Salalah Methanol Company Control Room Upgrade Phase 1

Construction & CommissioningMay 2018
Installation of Control & Automation System for SMC new control room including Lighting, Desks, Cabl

Oman Gas Company Commissioning

Construction & CommissioningAug 2017
Preparation of project specific Commissioning Procedures following OGC Commissioning & Start-up Proc

PDO CRM Pre & Commissioning EI&C Team

Construction & CommissioningOct 2017
The plants which were modernized were the Saih Nihayda Gas Plant (SNGP) and the Saih Rawl Central Pr

PDO Marmul Central Control Room Construction Support Services

Construction & CommissioningOct 2017
Building a modern new Marmul Central Control Room to be the central control location for all marmul

PDO Marmul Central Control Room Construction Support Services

Construction & CommissioningOct 2017
Building a modern new Marmul Central Control Room to be the central control location for all marmul

PDO SNCP Commissioning C&I Team

Construction & CommissioningJun 2017
The Saih Nihayda condensate stabilization plant will be built near the Saih Nihayda gas plant in the

BP Khazan CPF Commissioning C&I Team

Construction & CommissioningMay 2017
Located on a previously undeveloped desert site 350 kilometres south of Muscat, work on the Khazzan

PDO Glass Point Solar Steam Phase 2 Commissioning

Construction & CommissioningApr 2017
Check all control, automation and instrumentation with pre-commissioning check sheets and commission

ORPIC Aromatics Control Room Shutdown

Construction & CommissioningFeb 2017
Relocate 4 control panels including the addition of junction boxes and extension power and instrumen

ORPIC Sohar Refinery Improvement Project (SRIP) Package 3 & 5 C&I Construction & Commissioning

Construction & CommissioningNov 2015
The Sohar Refinery Improvement Project (SRIP) is a multi-billion dollar project for Oman Oil Refiner

Qatar Petroleum Feed Stream Integration & Fiscal Metering Systems Installation Feed Stream Integration Commissioning

Construction & CommissioningSep 2015
A 2 part project for supervising the pre-commissioning activities and responsible for safe Commissio

PDO Marmul Area Completions & Commissioning Services

Construction & CommissioningAug 2015
Commissioning Completions, Commissioning and Start-up for Several projects in the PDO Marmul Area co

Qatar Petroleum Khatiya Main to Khatiya South 20 Inch Pipeline Commissioning

Construction & CommissioningMay 2015
The objective of this project was to provide a new 20” Wet Gas bi-directional Pipeline between KM

Venezuela Smithco Air Coolers Commissioning

Construction & CommissioningAug 2014
Commissioning and Start-up for Air Coolers at refinery.

Qatar Petroleum Burn Pit Migration Commissioning

Construction & CommissioningMay 2014
Preparation of Commissioning Risks Matrix, systemisation, commissioning procedures, pre-commissionin

PDO Amal Power Station HRSG Commissioning Management

Construction & CommissioningOct 2013
Amal power station is a 250MW simple cycle using two GE Frame 9E turbines has been constructed by Al

PDO Nimr Polymer Commissioning & Start-up

Construction & CommissioningJul 2013
PDO built a new Polymer Injection Trial Facility at Nimr-E for Polymer Flood Trials in the Nimr E oi

PDO Rabab Harwell Integrated (RHI) Commissioning & Start-up Services

Construction & CommissioningSep 2013
The project was to further develop the high pressure reservoirs to yield 110,000 bbl/d through misci

PDO Marmul GNR Pump Commissioning Procedure

Construction & CommissioningOct 2012
Preparation of project specific Commissioning Procedures following PDO PR 1159 Commissioning & Start

PDO Harweel 2AB C&A Commissioning

Construction & CommissioningJun 2012
The project was to further develop the high pressure reservoirs to yield 110,000 bbl/d through misci

PDO Qarn Alum Power Station Commissioning Phase 1 & 2

Construction & CommissioningApr 2012
The power station was a 250MW simple cycle. Our engineers supported PDO in managing the third party

PDO Amal Power Station Commissioning Phase 2

Construction & CommissioningMar 2012
Amal power station is a 250MW simple cycle using two GE Frame 9E turbines has been constructed by Al

PDO Amal Power Station Commissioning Phase 1

Construction & CommissioningApr 2011
The power station was a 250MW simple cycle. Our engineers supported PDO in managing the third party

CCED Saiwan Engineering Services

Construction & Commissioning, ImplementationNov 2011
The project was split into an Early Development Facility where long term production testing can be i

PDO Harweel EDF DCS & Safety Systems Commissioning, Start-up and Optimisation.

Construction & Commissioning, Detailed Design & EngineeringJan 2004
Harweel Early Development Facility (EDF) project was a USD 100 Million project for Petroleum Develop

Bromborough Waste Water Treatment Works Control & Automation System

Construction & Commissioning, Detailed Design & EngineeringFeb 1999
This was a project to design & develop an end to end systems and software solution for the Bromborou

Wuxi Water Treatment Works Control & Automation System

Construction & Commissioning, Detailed Design & Engineering, ImplementationOct 1998
Specify, design, build the control system from User Requirements Specification for the end to end co

Liuzhou Water Treatment Works Control & Automation System

Construction & Commissioning, Detailed Design & Engineering, ImplementationMar 1997
Control and automation systems including PLCs and SCADA systems delivered from client P&IDs and PFDs

04. Commissioning Planning Systemisation & Completion Download

Abalto’s Commissioning Planning, Systemisation & Completion services offer a comprehensive approach to ensure project success. We can select or use your Completions Management System, craft a seamless Completions Strategy, and establish solid plan systemised by process. Our experts prepare a detailed Inspection Test Plan, select compliance-aligned procedures, certificates, and records, and create an efficient inspection and testing matrix. We also maintain the Commissioning Management System to reflect project progress accurately. Abalto’s precision ensures organised and informed Commissioning Planning, Systemisation & Completion, guaranteeing flawless start-up and operational readiness.

Choosing Abalto offers a range of advantages

At Abalto, we bring a distinct set of advantages that make us the ideal choice for your Commissioning Planning, Systemisation & Completion needs. Consider us for your project’s commissioning process with Abalto’s commitment to quality and success and discover how we can contribute to your project’s success. Our commitment and proven track record to commissioning excellence set us apart from the rest:

Experienced Professionals

Our team comprises seasoned professionals with a wealth of experience in Commissioning Planning, Systemisation & Completion. We understand the intricacies of the process, ensuring your project’s success.

Solid Foundation with Completions Systemisation

We recognize that a strong foundation is key to project success. Our approach involves initiating a Completions System during the Detailed Design phase in commissioning planning workshops, setting the stage for seamless progress as the project evolves.

Operational Readiness from Day One

We value the significance of operational readiness right from the start. With our extensive experience in Completions Management Systems (CMS), we have successfully managed over 140 commissioning projects, ensuring your project is prepared for smooth operations.

Meticulous Organisation with CMS

Our expertise lies in systematically organising project documentation through our Completions Management Systems (CMS). We carefully structure the CMS, incorporating relevant Check Sheets, Inspection Records, commissioning procedures, and certificates.

End-to-End Project Management

Our holistic approach ensures that your project remains on course, adheres to budget constraints, and manages risks effectively. From Engineering and Procurement to Construction and Start-Up, our proven track record provides assurance that your project’s commissioning process is in capable hands.

Operational Excellence Assured

Choosing Abalto for Commissioning Planning, Systemisation & Completion means choosing operational excellence. Our comprehensive expertise and dedication to excellence drive us to deliver exceptional results.

View Projects

Filter projects by:

  • Secondary Service
  • Industry
  • Client
  • Status
  • ApplyReset

Sort projects by:

  • 64projects executed
  • 605266person hours
  • 21949737contracts value ($)

Salalah Methanol Electrical, Instrumentation & Telecom E&F Area

Construction & CommissioningJun 2019
Salalah liquefied petroleum gas (SLPG) project is being developed in Dhofar, southern Oman, by Oman

Senior Commissioning Engineer

Construction & CommissioningAug 2022
Provision of Senior Commissioning Engineer

Preparation of Method Statement MPP3 Project

Construction & CommissioningJul 2022
Commissioning method statement

Daleel Commissioning Engineer

Construction & CommissioningJun 2021
Commissioning engineer services of additional separation project

AOTC Instrument Technicians for OQ LPG Project

Construction & CommissioningJun 2021
Manpower supply for Construction & Commissioning

SNC Manpower

Construction & CommissioningMay 2021
Manpower supply for Construction, Commissioning & Start-up

Daleel Tender 16 Commissioning Services

Construction & Commissioning, Detailed Design & EngineeringFeb 2021
Commissioning Services for additional separation train project (E-1782)

Commissioning documents for Mamul MMPS Availability Enhancement Project

Construction & Commissioning, Detailed Design & EngineeringJan 2021
Preparation of Commissioning documents for Mamul site SMES 200073E MMPS Availability Enhancement Pro

Marmul GCP Flare Project

Construction & CommissioningNov 2020
Preparation of Commissioning Documents for MAMRUL MMGCP Flare Project

Daleel Commissioning Engineer

Construction & Commissioning, Detailed Design & EngineeringNov 2020
DPS AP/LP Flare Replacement Project Commissioning Support

Oman LNG Systemisation

Construction & Commissioning, Detailed Design & EngineeringMay 2020
Preparation of Commissioning & Startup deliverables including Procedures, Plans and completions.

E&I for Salalah Methanol and Ammonia Plant

Construction & CommissioningApr 2020
Manpower supply for Construction & Commissioning

PDO MOV replacement project

Construction & CommissioningApr 2020
RLMU MOV Replacement

PDO Marmul Sarmad LPO Commissioning

Construction & Commissioning, Detailed Design & EngineeringJan 2020
Marmul Sarmad LPO Commissioning documentation

Birba Manifold Safeguarding & Flare Upgrade

Construction & Commissioning, Detailed Design & EngineeringFeb 2020
Birba Manifold Safeguarding & Flare Upgrade

BEC Demolition Projects D&E Stations CTR

Construction & Commissioning, Detailed Design & EngineeringDec 2019
Preparation of project specific Commissioning deliverables including Procedures, Plans and completio

Harweel New F&G Commissioning Deliverables

Construction & Commissioning, Detailed Design & EngineeringApr 2020
Preparation of project specific Commissioning deliverables including Procedures, Plans and completio

Cambridge Viscometer Commissioning Deliverables

Construction & Commissioning, Detailed Design & EngineeringSep 2019
Preparation of project specific Commissioning deliverables including Procedures, Plans and completio

Oil Tanks Commissioning Deliverables

Construction & Commissioning, Detailed Design & EngineeringSep 2019
Preparation of project specific Commissioning deliverables including Procedures, Plans and completio

Yibal Khuff E&I On Plot

Construction & CommissioningSep 2019
Manpower supply for Construction & Commissioning

SLPG Manpower Supply

Construction & CommissioningAug 2019
Manpower supply for commissioning

FCP Project CTRs Systemization work

Construction & Commissioning, Detailed Design & EngineeringMar 2019
Preparation of project specific Commissioning deliverables including Procedures, Plans and completio

PDO Marmul Fire Fighting Commissioning Projects

Construction & Commissioning, Detailed Design & EngineeringAug 2018
Preparation of project specific Commissioning deliverables including Procedures, Plans and completio

PDO Marmul MMA GRC Project Commissioning Deliverables

Construction & Commissioning, Detailed Design & EngineeringAug 2018
Preparation of project specific Commissioning deliverables including Procedures, Plans and completio

PDO Birba Changeover Site Activities

Construction & CommissioningMay 2018
PDO decided to upgrade the old Birba Cluster and started with a FEED and Detailed Design done by Aba

Salalah IPP Metering Stations

Construction & CommissioningAug 2017
Preparation of project specific Commissioning Procedures following OGC Commissioning & Start-up Proc

Salalah Methanol Company Control Room Upgrade Phase 1

Construction & CommissioningMay 2018
Installation of Control & Automation System for SMC new control room including Lighting, Desks, Cabl

PDO Birba Rejuvenation Commissioning Deliverables

Construction & Commissioning, Detailed Design & EngineeringAug 2017
Preparation of project specific Commissioning deliverables including Procedures, Plans and completio

PDO Qaharir Site Commissioning Control Room Upgrade Project

Construction & Commissioning, Detailed Design & EngineeringAug 2017
Preparation of project specific Commissioning deliverables including Procedures, Plans and completio

PDO Marmul Rationalization Project Commissioning

Construction & Commissioning, Detailed Design & EngineeringAug 2017
Preparation of project specific Commissioning deliverables including Procedures, Plans and completio

Oman Gas Company Commissioning

Construction & CommissioningAug 2017
Preparation of project specific Commissioning Procedures following OGC Commissioning & Start-up Proc

PDO CRM Pre & Commissioning EI&C Team

Construction & CommissioningOct 2017
The plants which were modernized were the Saih Nihayda Gas Plant (SNGP) and the Saih Rawl Central Pr

PDO Marmul Central Control Room Construction Support Services

Construction & CommissioningOct 2017
Building a modern new Marmul Central Control Room to be the central control location for all marmul

PDO Marmul Central Control Room Construction Support Services

Construction & CommissioningOct 2017
Building a modern new Marmul Central Control Room to be the central control location for all marmul

PDO Marmul MMPS Gas Compression Buildings Commissioning Procedures

Construction & Commissioning, Detailed Design & EngineeringAug 2017
Preparation of project specific Commissioning deliverables including Procedures, Plans and completio

PDO SNCP Commissioning C&I Team

Construction & CommissioningJun 2017
The Saih Nihayda condensate stabilization plant will be built near the Saih Nihayda gas plant in the

BP Khazan CPF Commissioning C&I Team

Construction & CommissioningMay 2017
Located on a previously undeveloped desert site 350 kilometres south of Muscat, work on the Khazzan

Qatar Petroleum NGL-2 De-Commissioning

Construction & Commissioning, Detailed Design & EngineeringMay 2017
Preparation of De-Commissioning Risks Matrix, de-commissioning procedures and check lists and conduc

PDO Glass Point Solar Steam Phase 2 Commissioning

Construction & CommissioningApr 2017
Check all control, automation and instrumentation with pre-commissioning check sheets and commission

ORPIC Aromatics Control Room Shutdown

Construction & CommissioningFeb 2017
Relocate 4 control panels including the addition of junction boxes and extension power and instrumen

PDO Marmul Pump Replacement Commissioning Procedures & Planning

Construction & Commissioning, Detailed Design & EngineeringMar 2017
Preparation of project specific Commissioning deliverables including Procedures, Plans and completio

PDO Birba Control Systems Revamp Detailed Design

Construction & Commissioning, Detailed Design & EngineeringJul 2016
PDO decided to upgrade the old Birba Cluster and started with FEED that was done by Abalto through I

ORPIC Sohar Refinery Improvement Project (SRIP) Package 3 & 5 C&I Construction & Commissioning

Construction & CommissioningNov 2015
The Sohar Refinery Improvement Project (SRIP) is a multi-billion dollar project for Oman Oil Refiner

Qatar Petroleum Feed Stream Integration & Fiscal Metering Systems Installation Feed Stream Integration Commissioning

Construction & CommissioningSep 2015
A 2 part project for supervising the pre-commissioning activities and responsible for safe Commissio

PDO Marmul Area Completions & Commissioning Services

Construction & CommissioningAug 2015
Commissioning Completions, Commissioning and Start-up for Several projects in the PDO Marmul Area co

PDO Completions System Control & Instrumentation Check Sheet Update

Construction & Commissioning, Detailed Design & EngineeringMar 2015
Update of the Control & Instrumentation Check Sheets to incorporate new types of control instrumenta

OOCEP Abu Tabul Commissioning Management

Construction & CommissioningJan 2015
Preparation of project specific Commissioning Planning and management of commissioning teams followi

Venezuela Smithco Air Coolers Commissioning

Construction & CommissioningAug 2014
Commissioning and Start-up for Air Coolers at refinery.

Qatar Petroleum Burn Pit Migration Commissioning

Construction & CommissioningMay 2014
Preparation of Commissioning Risks Matrix, systemisation, commissioning procedures, pre-commissionin

PDO Amal Power Station HRSG Commissioning Management

Construction & CommissioningOct 2013
Amal power station is a 250MW simple cycle using two GE Frame 9E turbines has been constructed by Al

PDO Qarn Alam Power Station Phase 3 Commissioning

Construction & CommissioningApr 2013
The power station was a 250MW simple cycle. Our engineers supported PDO in managing the third party

PDO Nimr Polymer Commissioning & Start-up

Construction & CommissioningJul 2013
PDO built a new Polymer Injection Trial Facility at Nimr-E for Polymer Flood Trials in the Nimr E oi

PDO Rabab Harwell Integrated (RHI) Commissioning & Start-up Services

Construction & CommissioningSep 2013
The project was to further develop the high pressure reservoirs to yield 110,000 bbl/d through misci

PDO Commissioning Systemisation, Commissioning Completion & Commissioning 2 Year Contract

Construction & Commissioning, Detailed Design & EngineeringMar 2013
Several projects document inputs were collected and Commissioning Systemisation conducted with prepa

OOCEP Musandam Gas Processing Plant Commissioning Procedures

Construction & Commissioning, Detailed Design & EngineeringMar 2013
Preparation of project specific Buildings Commissioning Procedures.

PDO Marmul GNR Pump Commissioning Procedure

Construction & CommissioningOct 2012
Preparation of project specific Commissioning Procedures following PDO PR 1159 Commissioning & Start

PDO Harweel 2AB C&A Commissioning

Construction & CommissioningJun 2012
The project was to further develop the high pressure reservoirs to yield 110,000 bbl/d through misci

PDO Qarn Alum Power Station Commissioning Phase 1 & 2

Construction & CommissioningApr 2012
The power station was a 250MW simple cycle. Our engineers supported PDO in managing the third party

PDO Amal Power Station Commissioning Phase 1

Construction & CommissioningApr 2011
The power station was a 250MW simple cycle. Our engineers supported PDO in managing the third party

CCED Saiwan Engineering Services

Construction & Commissioning, ImplementationNov 2011
The project was split into an Early Development Facility where long term production testing can be i

Qatar Petroleum Filter Commissioning

Construction & CommissioningApr 2010
Abalto safely and successfully delivered commissioning procedures, conducted process commissioning a

AGIP Kashaghan Pipeline

Construction & Commissioning, Detailed Design & Engineering, ManagementJun 2009
Project management of PMSC team located in Saipem’s Spa office in Milan to ensure Electrical and C

Qatar Petroleum GTC 189/ED/03 EPIC of an independent Flare for QJA-1 & 2 and Replacement Separators at Dukhan Fields

Construction & Commissioning, Detailed Design & EngineeringApr 2005
Abalto safely and successfully delivered commissioning procedures, conducted process commissioning a

TheatreTech China Control & Automation System

Construction & Commissioning, Detailed Design & EngineeringFeb 1989
A project to complete the construction and commissioning for 2 performing arts theatres in Shenzhen

05. Pre-Commissioning & Commissioning Download

At Abalto, we specialise in providing comprehensive Pre-Commissioning & Commissioning services for Industrial Control Systems. Our Pre-Commissioning services ensure a seamless transition from project Construction to Operational systems. We start with detailed planning and preparation, creating a roadmap for efficient execution. Following structured phase gate-approved processes, we meticulously plan commissioning, set milestones, and conduct thorough inspections and verifications. Our experts ensure system interfaces are tested, perform cold loop testing, and calibrate instruments. Before system by system commissioning, we prioritise safety, cleanliness, readiness. Our comprehensive approach includes documentation of all activities, from design collection to vendor interface management. Abalto’s commitment to quality, reliability, and efficiency ensures your industrial control systems are fully tested and ready for flawless start-up and successful operation.

Choosing Abalto offers a range of advantages

Abalto is your trusted partner for Pre-Commissioning and Commissioning services. Our team of experienced engineers brings in-depth knowledge and expertise to ensure your control systems are primed for start up. With a commitment to quality, reliability, efficiency and compliance, we provide you with the confidence that your industrial control systems are ready for operation.

Abalto’s approach to Pre-Commissionin and Commissioning is rooted in our commitment to quality, reliability, and efficiency. Our experienced team of engineers brings a wealth of knowledge to ensure your industrial control systems are tested and ready. With our services, you gain the confidence that your systems are primed for optimal and flawless start up and prepared for a successful operation.

Expertise and Experience

Our team consists of seasoned professionals with years of hands-on experience in the field. We understand the intricacies of industrial control systems and take time to fully understand the continuous or batch processes behaviours and limits and the challenges that arise during the commissioning process.

Thorough Assessment

Our team begins by conducting a comprehensive assessment of your industrial control system, identifying potential challenges and areas for optimisation.

Risk Mitigation

Identifying and mitigating potential risks is a crucial part of our approach. We anticipate and address potential bottlenecks or failures to keep your project on track.

Tailored Planning

Based on the assessment, we develop a detailed pre-commissioning and commissioning plan that outlines the necessary steps, timelines, and resources required for a smooth execution.

Tools & Techniques

We utilise the latest tools and techniques to optimise the pre-commissioning and commissioning processes, enhancing the overall performance and functionality of your control systems.

Rigorous Testing

We implement a rigorous testing regime to ensure all components of your control system function as intended. This includes functional testing, safety testing, and performance testing.

Documentation

Clear and comprehensive documentation is provided at every stage of the process. This documentation serves as a valuable reference for future maintenance and troubleshooting.

View Projects

Filter projects by:

  • Secondary Service
  • Industry
  • Client
  • Status
  • ApplyReset

Sort projects by:

  • 123projects executed
  • 723755person hours
  • 25499596contracts value ($)

Senior Commissioning Engineer, Technicians & Operators

Construction & CommissioningFeb 2023
Site Manpower Services

Salalah Methanol Electrical, Instrumentation & Telecom E&F Area

Construction & CommissioningJun 2019
Salalah liquefied petroleum gas (SLPG) project is being developed in Dhofar, southern Oman, by Oman

Senior Commissioning Engineer

Construction & CommissioningAug 2022
Provision of Senior Commissioning Engineer

Daleel Commissioning Engineer

Construction & CommissioningJun 2021
Commissioning engineer services of additional separation project

AOTC Instrument Technicians for OQ LPG Project

Construction & CommissioningJun 2021
Manpower supply for Construction & Commissioning

SNC Manpower

Construction & CommissioningMay 2021
Manpower supply for Construction, Commissioning & Start-up

E&I for Salalah Methanol and Ammonia Plant

Construction & CommissioningApr 2020
Manpower supply for Construction & Commissioning

PDO MOV replacement project

Construction & CommissioningApr 2020
RLMU MOV Replacement

Yibal Khuff E&I On Plot

Construction & CommissioningSep 2019
Manpower supply for Construction & Commissioning

SLPG Manpower Supply

Construction & CommissioningAug 2019
Manpower supply for commissioning

PDO Camp Substation Commissioning

Construction & Commissioning, Detailed Design & EngineeringJan 2019
Preparation of project specific Commissioning deliverables including Procedures, Plans and completio

PDO Greater Birba Well Head Hydraulic Control Panel Maintenance Technicians Team

Construction & CommissioningFeb 2018
Conduct a site survey of all Well Heads and determine the Well Head Control Panels (WHCP) that are n

PDO Birba Changeover Site Activities

Construction & CommissioningMay 2018
PDO decided to upgrade the old Birba Cluster and started with a FEED and Detailed Design done by Aba

Salalah IPP Metering Stations

Construction & CommissioningAug 2017
Preparation of project specific Commissioning Procedures following OGC Commissioning & Start-up Proc

Salalah Methanol Company Control Room Upgrade Phase 1

Construction & CommissioningMay 2018
Installation of Control & Automation System for SMC new control room including Lighting, Desks, Cabl

PDO Qaharir Site Commissioning Control Room Upgrade Project

Construction & Commissioning, Detailed Design & EngineeringAug 2017
Preparation of project specific Commissioning deliverables including Procedures, Plans and completio

PDO Marmul Rationalization Project Commissioning

Construction & Commissioning, Detailed Design & EngineeringAug 2017
Preparation of project specific Commissioning deliverables including Procedures, Plans and completio

Oman Gas Company Commissioning

Construction & CommissioningAug 2017
Preparation of project specific Commissioning Procedures following OGC Commissioning & Start-up Proc

Daleel Polymer Injection Skid Commissioning, Operations & Maintenance Team 1 Year Contract

Construction & Commissioning, Operations & MaintenanceDec 2017
Manage the skid connections, followed by commissioning and operations at site. Maintenance challenge

PDO CRM Pre & Commissioning EI&C Team

Construction & CommissioningOct 2017
The plants which were modernized were the Saih Nihayda Gas Plant (SNGP) and the Saih Rawl Central Pr

PDO Marmul Central Control Room Construction Support Services

Construction & CommissioningOct 2017
Building a modern new Marmul Central Control Room to be the central control location for all marmul

PDO Marmul Central Control Room Construction Support Services

Construction & CommissioningOct 2017
Building a modern new Marmul Central Control Room to be the central control location for all marmul

PDO SNCP Commissioning C&I Team

Construction & CommissioningJun 2017
The Saih Nihayda condensate stabilization plant will be built near the Saih Nihayda gas plant in the

Qatar Petroleum NGL-2 De-Commissioning

Construction & Commissioning, Detailed Design & EngineeringMay 2017
Preparation of De-Commissioning Risks Matrix, de-commissioning procedures and check lists and conduc

PDO Glass Point Solar Steam Phase 2 Commissioning

Construction & CommissioningApr 2017
Check all control, automation and instrumentation with pre-commissioning check sheets and commission

Qatar Shell Pearl GTL C&I Manpower Supply Services

Construction & Commissioning, Detailed Design & EngineeringMar 2017
Download all project logic, conduct conversions to new firmware software revisions, validate and upl

ORPIC Aromatics Control Room Shutdown

Construction & CommissioningFeb 2017
Relocate 4 control panels including the addition of junction boxes and extension power and instrumen

PDO Marmul Pump Replacement Commissioning Procedures & Planning

Construction & Commissioning, Detailed Design & EngineeringMar 2017
Preparation of project specific Commissioning deliverables including Procedures, Plans and completio

ORPIC Sohar Refinery Improvement Project (SRIP) Package 3 & 5 C&I Construction & Commissioning

Construction & CommissioningNov 2015
The Sohar Refinery Improvement Project (SRIP) is a multi-billion dollar project for Oman Oil Refiner

Qatar Petroleum Feed Stream Integration & Fiscal Metering Systems Installation Feed Stream Integration Commissioning

Construction & CommissioningSep 2015
A 2 part project for supervising the pre-commissioning activities and responsible for safe Commissio

Qatar Shell Pearl GTL PAS & ENMCS Systems Upgrade

Construction & Commissioning, Detailed Design & EngineeringSep 2015
Download all project logic, conduct conversions to new firmware software revisions, validate and upl

PDO Marmul Area Completions & Commissioning Services

Construction & CommissioningAug 2015
Commissioning Completions, Commissioning and Start-up for Several projects in the PDO Marmul Area co

Qatar Petroleum Khatiya Main to Khatiya South 20 Inch Pipeline Commissioning

Construction & CommissioningMay 2015
The objective of this project was to provide a new 20” Wet Gas bi-directional Pipeline between KM

PDO Amal Power Station HRSG Commissioning

Construction & CommissioningDec 2014
Amal power station is a 250MW simple cycle using two GE Frame 9E turbines has been constructed by Al

OOCEP Abu Tabul Commissioning Management

Construction & CommissioningJan 2015
Preparation of project specific Commissioning Planning and management of commissioning teams followi

Venezuela Smithco Air Coolers Commissioning

Construction & CommissioningAug 2014
Commissioning and Start-up for Air Coolers at refinery.

OOCEP Abu Tabul Commissioning Management

Construction & CommissioningJun 2014
Confirm Mechanical Completion and then follow Pre-Commissioning Check Sheets.

Qatar Petroleum Burn Pit Migration Commissioning

Construction & CommissioningMay 2014
Preparation of Commissioning Risks Matrix, systemisation, commissioning procedures, pre-commissionin

PDO Gas CCR Systems Integration

Construction & Commissioning, Detailed Design & Engineering, ImplementationFeb 2014
All Local and Regional Gas Control Rooms were unified at the new Gas CCR. All DCS systems Operator s

PDO Amal Power Station HRSG Commissioning Management

Construction & CommissioningOct 2013
Amal power station is a 250MW simple cycle using two GE Frame 9E turbines has been constructed by Al

PDO Qarn Alam Power Station Phase 3 Commissioning

Construction & CommissioningApr 2013
The power station was a 250MW simple cycle. Our engineers supported PDO in managing the third party

PDO Nimr Polymer Commissioning & Start-up

Construction & CommissioningJul 2013
PDO built a new Polymer Injection Trial Facility at Nimr-E for Polymer Flood Trials in the Nimr E oi

PDO Rabab Harwell Integrated (RHI) Commissioning & Start-up Services

Construction & CommissioningSep 2013
The project was to further develop the high pressure reservoirs to yield 110,000 bbl/d through misci

PDO Harweel 2AB C&A Commissioning

Construction & CommissioningJun 2012
The project was to further develop the high pressure reservoirs to yield 110,000 bbl/d through misci

PDO Qarn Alum Power Station Commissioning Phase 1 & 2

Construction & CommissioningApr 2012
The power station was a 250MW simple cycle. Our engineers supported PDO in managing the third party

PDO Amal Power Station Commissioning Phase 2

Construction & CommissioningMar 2012
Amal power station is a 250MW simple cycle using two GE Frame 9E turbines has been constructed by Al

PDO Amal Power Station Commissioning Phase 1

Construction & CommissioningApr 2011
The power station was a 250MW simple cycle. Our engineers supported PDO in managing the third party

CCED Saiwan Engineering Services

Construction & Commissioning, ImplementationNov 2011
The project was split into an Early Development Facility where long term production testing can be i

Qatar Petroleum Filter Commissioning

Construction & CommissioningApr 2010
Abalto safely and successfully delivered commissioning procedures, conducted process commissioning a

Qatar Petroleum GTC 189/ED/03 EPIC of an independent Flare for QJA-1 & 2 and Replacement Separators at Dukhan Fields

Construction & Commissioning, Detailed Design & EngineeringApr 2005
Abalto safely and successfully delivered commissioning procedures, conducted process commissioning a

PDO Harweel EDF DCS & Safety Systems Commissioning, Start-up and Optimisation.

Construction & Commissioning, Detailed Design & EngineeringJan 2004
Harweel Early Development Facility (EDF) project was a USD 100 Million project for Petroleum Develop

Pringles Production Control & Automation System

Construction & Commissioning, Detailed Design & EngineeringOct 2003
Develop a complete control & automation system including PLC, SCADA and distributed VSD drive transp

Birkenhead BAFF Wash Plant Control System Upgrades

Construction & Commissioning, Detailed Design & EngineeringJun 2003
Validate and optimise the BAFF Backwash sequences for 8 cells at the Birkenhead Waste Water Treatmen

Stingray Sub Sea Power Generation Pilot Plant Control System on-site Engineering & Commissioning

Construction & Commissioning, Detailed Design & EngineeringMay 2003
Modifications to PLC and SCADA software for control of hydrofoil angel to optimise power generation.

Waste Water Treatment Works Sustainability Control System Upgrade

Construction & Commissioning, Detailed Design & Engineering, ImplementationApr 2003
Modifications to PLC Control System to include closed loop control for control valves.

Klampress Filtrate Control System

Construction & Commissioning, Detailed Design & Engineering, ImplementationOct 2002
Develop PLC control system software for a Klampress Filtrate Press including interlocks, interfacing

Chelmsford Sludge Pasteurisation Plant Control & Automation System Engineering, Commissioning & Start-up

Construction & Commissioning, Detailed Design & Engineering, ImplementationSep 2002
Control system and software design and development for a continuous batch process control of Sludge

Bromborough Remediation Control System Upgrade

Construction & Commissioning, Detailed Design & EngineeringAug 2002
Modifications to PLC Control System for best process control by conducting PID tuning of BAFF Plant

Bedford Imported Sludge Control System Upgrade

Construction & Commissioning, Detailed Design & Engineering, ImplementationAug 2002
Modifications to the control sequences for decanting imported sludge.

Great Billing Sludge Pasteurisation Plant Control & Automation System Engineering, Commissioning & Start-up

Construction & Commissioning, Detailed Design & Engineering, ImplementationJul 2002
Control system and software design and development for a continuous batch process control of Sludge

Bedford Sludge Pasteurisation Plant Control & Automation System Engineering, Commissioning & Start-up

Construction & Commissioning, Detailed Design & Engineering, ImplementationJun 2002
Control system and software design and development for a continuous batch process control of Sludge

Pernton & Newton SatCon Control System Communication Interfaces Modifications

Construction & Commissioning, Detailed Design & EngineeringMay 2002
Modifications to PLC control system communication module to send equipment status to SCADA

Cliff Quay Sludge Pasteurisation Plant Control & Automation System Engineering, Commissioning & Start-up

Construction & Commissioning, Detailed Design & Engineering, ImplementationApr 2002
Control system and software design and development for a continuous batch process control of Sludge

Replacement of Paint Spray Booth Baffles

Construction & CommissioningMar 2002
Replacement of Paint Spray Booth Baffles and modifications to Control System including air flow moni

Cambridge Sludge Pasteurisation Plant Control & Automation System Engineering, Commissioning & Start-up

Construction & Commissioning, Detailed Design & Engineering, ImplementationMar 2002
Control system and software design and development for a continuous batch process control of Sludge

Skid Body Transport to Storage Upgrades

Construction & Commissioning, Detailed Design & EngineeringFeb 2002
Modifications to control system for Skid Body Transport to Storage including counting, Skid Identifi

Relocate Hoist Rail & Control System

Construction & Commissioning, Detailed Design & EngineeringJan 2002
Modifications to the controls for relocation of Hoist Rail Transport System including safety interlo

Caister Sludge Pasteurisation Plant Control & Automation System Engineering, Commissioning & Start-up

Construction & Commissioning, Detailed Design & Engineering, ImplementationJan 2002
Control system and software design and development for a continuous batch process control of Sludge

Chelmsford Imported Sludge Control System

Construction & Commissioning, Detailed Design & Engineering, ImplementationNov 2001
Modifications to the control sequences for decanting imported sludge.

Bromborough PLC & SCADA System Commissioning

Construction & Commissioning, Detailed Design & Engineering, ImplementationJun 2001
Commissioning for a complete 500 MLD Waste Water Treatment Works.

Spray Booth Effluent Treatment Plant Control System Upgrade

Construction & Commissioning, Detailed Design & Engineering, ImplementationJun 2001
Modifications to PLC controls for the Spray Booth Effluent Treatment Plant Purge and Back Wash Cycle

Kings Lynn Waste Water Treatment Works Control & Automation System

Construction & Commissioning, Detailed Design & Engineering, ImplementationMay 2001
Modification of SCADA scripts to make communications robust. Failure in field communications wiring

West Mersey Waste Water Treatment Works Control & Automation System

Construction & Commissioning, Detailed Design & EngineeringApr 2001
Modifications to PLC Control System for best process control by conducting PID tuning of BAFF Plant

King Lynn Waste Water Treatment Works Pulsed Xenon Ultraviolet Plant Control System

Construction & Commissioning, Detailed Design & Engineering, ImplementationMar 2001
Development of a control system for safeguard against cryptosporidium outbreaks using pulsed Xenon U

Chelmsford Waste Water Treatment Works SCADA System Upgrades

Construction & Commissioning, Detailed Design & Engineering, ImplementationMar 2001
Modify SCADA reports to client requirement to show and print daily, weekly and monthly production to

Spray Booth Drip Trays Control Systems Modifications

Construction & Commissioning, Detailed Design & EngineeringMar 2001
Modifications to the control systems for Drip Trays water cleaning systems for trickle and forced wa

Intumescent Paint Spray Booth Automation & Control System Upgrade

Construction & Commissioning, Detailed Design & Engineering, ImplementationMar 2001
Modifications to the Control & Automation System for Intumescent Paint Spray Booth for loading, entr

Newhaven Waste Water Treatment Works PICs Process Simulation System

Construction & Commissioning, Detailed Design & Engineering, ImplementationFeb 2001
Using P&IDs and process narrative Process Flow Charts were created which were then used to do the so

Pulsed Xenon Ultraviolet Pilot Plant Control System

Construction & Commissioning, Detailed Design & Engineering, ImplementationJan 2001
Development of a control system for safeguard against cryptosporidium outbreaks using pulsed Xenon U

Intumescent Paint Spray Booth Automation & Control System Commissioning & Start-up

Construction & Commissioning, Detailed Design & Engineering, ImplementationSep 2000
Installation of Control & Automation System for Intumescent Paint Spray Booth with loading, entry an

Bo’ness Waste Water Treatment Works Control Valves Modifications

Construction & Commissioning, Detailed Design & Engineering, ImplementationAug 2000
Modifications to PLC Control System for best process control by conducting PID tuning of all control

Underseal Spray Deck Modification to Control System

Construction & Commissioning, Detailed Design & Engineering, ImplementationJul 2000
Modifications to PLC Control System for an Wax Underseal Spray Deck to accommodate new car underbody

Exit to Audit Spur Control System Upgrade

Construction & Commissioning, Detailed Design & EngineeringMay 2000
Modifications to the PLC Control System Track Change Exit to Audit Spur with the addition of positio

Infra Red Oven Protection Control System

Construction & Commissioning, Detailed Design & EngineeringApr 2000
Modifications to the PLC Control System for Infra Red Oven protection by the addition of F&G Heat De

Cotton Valley Waste Water Treatment Works Control & Automation System

Construction & Commissioning, Detailed Design & EngineeringMar 2000
Modifications to the control system for a Waste Water Treatment Works including Buffer Tanks, Digest

Kawasaki Heavy Industries Tunnel Boring Machine Control System for Canary Wharf River Thames Crossing

Construction & Commissioning, Detailed Design & EngineeringJul 1999
Development of a PLC and HMI Control System for a Tunnel Boring Machine with controls for the Cutter

Bromborough Waste Water Treatment Works Control & Automation System

Construction & Commissioning, Detailed Design & EngineeringFeb 1999
This was a project to design & develop an end to end systems and software solution for the Bromborou

Wuxi Water Treatment Works Control & Automation System

Construction & Commissioning, Detailed Design & Engineering, ImplementationOct 1998
Specify, design, build the control system from User Requirements Specification for the end to end co

Harwich Waste Water Treatment Works Control & Automation System

Construction & Commissioning, Detailed Design & Engineering, ImplementationMay 1998
Modifications to the control system for a Waste Water Treatment Works including Buffer Tanks, Digest

Chelmsford Waste Water Treatment Works Control & Automation System

Construction & Commissioning, Detailed Design & Engineering, ImplementationApr 1998
Provision of a complete control system for the process control including Rotating Bar Interceptors,

Track Shoes Heat Treatment Furnaces Control & Automation System

Construction & Commissioning, Detailed Design & EngineeringFeb 1998
Provision of a full control & automation system for 2 Caterpillar Track Shoe Heat Treatment Furnaces

Kia Motors Reciprocator Paint Spray Booths

Construction & Commissioning, Detailed Design & EngineeringJan 1998
Development of PLC & SCADA control system for 2 Reciprocating Robots and Spray Booths water and air

Toyota Derby Junior Paint Mix Room control system modifications

Construction & Commissioning, Detailed Design & EngineeringJul 1997
Modifications control system for Air Handling and Mixing Systems in the Junior Paint Mix Room in Toy

Liuzhou Water Treatment Works Control & Automation System

Construction & Commissioning, Detailed Design & Engineering, ImplementationMar 1997
Control and automation systems including PLCs and SCADA systems delivered from client P&IDs and PFDs

Coventry Paint Booth Control System Upgrade

Construction & Commissioning, Detailed Design & EngineeringMar 1997
Upgrade of the PLC Control System for Colour Change Flushing sequences in Paint Booth at Renault in

Coleshill Waste Water Treatment Works Control System Upgrade

Construction & Commissioning, Detailed Design & Engineering, ImplementationFeb 1997
Upgrade the control system for timed control of Limitorque de-sludging valves with status feedback t

Coleshill Waste Water Treatment Works Control System

Construction & Commissioning, Detailed Design & Engineering, ImplementationApr 1996
Upgrade the PLC control for the addition of level controls to sludge pits pumping system.

Worchester Waste Water Treatment Works Control System Upgrade

Construction & Commissioning, Detailed Design & Engineering, ImplementationMar 1996
Upgrade the PLC Control for the addition of effluent tanks decanting values and level transmitters.

Gypsum Production Control System

Construction & Commissioning, Detailed Design & EngineeringJun 1995
Development of an automated Production Control System for Gypsum Boards with mixers, formers, Drying

Intumescent Paint Spray Booth Automation & Control System

Construction & Commissioning, Detailed Design & EngineeringApr 1995
Development of a Control & Automation System for Intumescent Paint Spray Booth with loading, entry a

Chocolate Shells Mixing Temperature Control System

Construction & Commissioning, Detailed Design & EngineeringJun 1994
Modifications to Allen Bradley 1769 PLC control software for temperature control of chocolate mixing

Actuator Control Communication System

Construction & Commissioning, Detailed Design & EngineeringFeb 1994
Development of a software using Visual Basic for a communication system for configuring and status f

Paint Shop and Mix Room Control System

Construction & Commissioning, Detailed Design & Engineering, ImplementationAug 1993
Full Paint Shop and Mix Room Control System including Paint Mix Room and 2 full Paint Lines.

BASS Brewers New Control & Automation System

Construction & Commissioning, Detailed Design & Engineering, ImplementationAug 1993
Batch production system for a brewery control & automation system for wort production, fermentation

Mayonnaise Mixer Automation

Construction & Commissioning, Detailed Design & EngineeringJun 1993
Modifications to PLC software for High Speed Mayonnaise Mixer interlocked with upstream ingredients

Radiator Heat Treatment Control System

Construction & Commissioning, Detailed Design & EngineeringMar 1993
Automation of welding, heat treatment, cooling, water fill and pressure testing with PLC & SCADA con

Oven Door Replacement Control System

Construction & Commissioning, Detailed Design & EngineeringFeb 1993
Modifications to PLC software Oven door replacement interlocked with track movement and fire detecti

Tooks Automated Dough Mixers

Construction & Commissioning, Detailed Design & Engineering, ImplementationOct 1991
PLC and SCADA control system for High Speed Automated Dough Mixers with recipes manager batching & c

CPECC Sonatrach Refinery Premabergo LPG & Propane Packages Commissioning & Start-up

Construction & Commissioning, Detailed Design & Engineering, ImplementationMar 2019
Premabergo was not able to commission the packages and we were approached to conduct this and provid

Roberts Automated Dough Mixers

Construction & Commissioning, Detailed Design & Engineering, ImplementationAug 1991
PLC and SCADA control system for High Speed Automated Dough Mixers with recipes manager batching & c

Manbrot Automated Dough Mixers

Construction & Commissioning, Detailed Design & Engineering, ImplementationJul 1991
PLC and SCADA control system for High Speed Automated Dough Mixers with recipes manager batching & c

Bokomo Automated Dough Mixers

Construction & Commissioning, Detailed Design & Engineering, ImplementationMay 1991
PLC and SCADA control system for High Speed Automated Dough Mixers with recipes manager batching & c

Automated Dough Mixers

Construction & Commissioning, Detailed Design & Engineering, ImplementationMar 1991
Writing a detailed Functional & Systems Design Specification, PLC software and SCADA screen Typicals

Re-Bar Bender 3

Construction & Commissioning, Detailed Design & Engineering, ImplementationDec 1990
Control panel design and software development and the build of control panel and cabling installatio

Shear Line 2

Construction & Commissioning, Detailed Design & Engineering, ImplementationNov 1990
Control panel design and software development and the build of control panel and cabling installatio

Re-Bar Bender 2

Construction & Commissioning, Detailed Design & Engineering, ImplementationAug 1990
Control panel design and software development and the build of control panel and cabling installatio

Shear Line 1

Construction & Commissioning, Detailed Design & Engineering, ImplementationJun 1990
Control panel design and software development and the build of control panel and cabling installatio

Re-Bar Bender 1

Construction & Commissioning, Detailed Design & Engineering, ImplementationApr 1990
Control panel design and software development and the build of control panel and cabling installatio

TheatreTech China Control & Automation System

Construction & Commissioning, Detailed Design & EngineeringFeb 1989
A project to complete the construction and commissioning for 2 performing arts theatres in Shenzhen

Binks Bullows Mini Paint Booth

Construction & Commissioning, Detailed Design & Engineering, ImplementationFeb 1988
Development of PLC control software for a mini paint spray booth for temperature and air flow contro

Rover Longbridge Chiller Control System

Construction & Commissioning, Detailed Design & EngineeringNov 1987
Refurbishment of chiller temperature control where chilled water was used for a pint mix room temper

Nissan Paint Shop Refurbishment

Construction & Commissioning, Detailed Design & Engineering, ImplementationAug 1987
Refurbishment of Derby plant paint shop to control colour selection, flow and pressure for delivery

Paint Mix Room Control System

Construction & Commissioning, Detailed Design & Engineering, ImplementationJun 1987
Paint mix room control of temperature, flow and pressure including colour change control for deliver

06. Start Up Audit Start Up & Process Optimisation Download

At Abalto, we offer comprehensive Commissioning, Start-up & Process Optimisation services tailored to industrial control systems. Our approach ensures that your systems are not only operational but also optimised for peak performance and efficiency. From initial commissioning to fine-tuning processes, we provide the expertise and support needed for seamless operations.

We also offer comprehensive Pre Start-Up Checks & Audit services at site for industrial control systems. The period before start-up is critical to ensure that your industrial control systems are ready to function optimally. We identify any potential issues and rectify them before they can impact start up and operations.

Here’s why you should choose us

Commissioning and Start-Up represent the exciting phase when equipment and processes come alive. However, this pivotal juncture requires careful evaluation due to potential unexpected challenges.

Abalto’s disciplined processes, software utilisation, workflow focus, and unwavering commitment to safety make us a trusted Commissioning & Start-Up partner. With decades of experience, we contribute value across project stages, ensuring a smooth and successful Start-Up.

Navigating Tight Timelines and Complex Technologies

Bringing a facility or process online within tight timelines, particularly when intricate technologies are involved, demands specialised skills and experience. A dedicated commissioning team collaborates with licensors, customers, construction teams, vendors, and personnel. This team handles various activities, including process testing.

Systematic Planning Enhancing Efficiency

To ensure a seamless and secure process, we systemise it into work packs, considering process interdependencies. This systematic approach empowers EPC contractors to update their schedules and allocate resources efficiently. Moreover, it allows construction and Pre-Commissioning tasks to run in parallel.

Mitigating Delays for a Strategic Approach

By adopting this systems approach, the commissioning team inherits past project issues and delays. This method enables Pre-Commissioning and Commissioning to commence as soon as segments of the plant reach mechanical completion, saving crucial time.

Precision in System Alignment

Abalto engineers excel in commissioning systems to align with design specifications safely. Our approved Commissioning Procedure ensures top-notch quality during the Start-Up phase.

Seasoned Expertise to Navigating Challenges

Backed by years of direct Oil & Gas Commissioning and Start-Up experience, Abalto personnel approach their work methodically, addressing potential risks. We form dedicated teams to streamline activities and craft essential documentation for Pre-Commissioning, Commissioning, and Start-Up. This proactive approach ensures regulatory compliance and timely, safe Start-Up.

Collaborative Planning and Execution

Collaborating closely with owners and EPC contractors, our team devises optimal Commissioning & Start-Up plans. Our experts are onsite to lead and execute activities according to the plan.

Meticulous Validation Ensuring Control

Our prowess in automation and process control projects enables us to identify control failures. We validate interfaces with other systems when needed. All commissioning steps are meticulously documented, and changes are controlled.

Testing Control Philosophy Ensuring Adherence

We understand the value of functional checks in verifying control philosophy adherence. Site acceptance test certificates, produced following thorough witness testing, further enhance our process.

Seamless Integration and Completion

Changes introduced late can disrupt schedules, and we adhere to our change control system for seamless integration. Following a successful commissioning, we present a Commissioning Completion Certificate. For specialised equipment commissioning, we collaborate with equipment vendors under our supervision.

View Projects

Filter projects by:

  • Secondary Service
  • Industry
  • Client
  • Status
  • ApplyReset

Sort projects by:

  • 124projects executed
  • 724855person hours
  • 26023145contracts value ($)

Senior Commissioning Engineer, Technicians & Operators

Construction & CommissioningFeb 2023
Site Manpower Services

Salalah Methanol Electrical, Instrumentation & Telecom E&F Area

Construction & CommissioningJun 2019
Salalah liquefied petroleum gas (SLPG) project is being developed in Dhofar, southern Oman, by Oman

Senior Commissioning Engineer

Construction & CommissioningAug 2022
Provision of Senior Commissioning Engineer

Daleel Commissioning Engineer

Construction & CommissioningJun 2021
Commissioning engineer services of additional separation project

AOTC Instrument Technicians for OQ LPG Project

Construction & CommissioningJun 2021
Manpower supply for Construction & Commissioning

SNC Manpower

Construction & CommissioningMay 2021
Manpower supply for Construction, Commissioning & Start-up

Modernization of Control Room

Construction & Commissioning, Detailed Design & EngineeringSep 2020
Design, Engineering, demolition, installation, commissioning & startup with parallel operations for

E&I for Salalah Methanol and Ammonia Plant

Construction & CommissioningApr 2020
Manpower supply for Construction & Commissioning

PDO MOV replacement project

Construction & CommissioningApr 2020
RLMU MOV Replacement

Yibal Khuff E&I On Plot

Construction & CommissioningSep 2019
Manpower supply for Construction & Commissioning

SLPG Manpower Supply

Construction & CommissioningAug 2019
Manpower supply for commissioning

PDO Camp Substation Commissioning

Construction & Commissioning, Detailed Design & EngineeringJan 2019
Preparation of project specific Commissioning deliverables including Procedures, Plans and completio

PDO Greater Birba Well Head Hydraulic Control Panel Maintenance Technicians Team

Construction & CommissioningFeb 2018
Conduct a site survey of all Well Heads and determine the Well Head Control Panels (WHCP) that are n

PDO Birba Changeover Site Activities

Construction & CommissioningMay 2018
PDO decided to upgrade the old Birba Cluster and started with a FEED and Detailed Design done by Aba

Salalah IPP Metering Stations

Construction & CommissioningAug 2017
Preparation of project specific Commissioning Procedures following OGC Commissioning & Start-up Proc

Salalah Methanol Company Control Room Upgrade Phase 1

Construction & CommissioningMay 2018
Installation of Control & Automation System for SMC new control room including Lighting, Desks, Cabl

PDO Qaharir Site Commissioning Control Room Upgrade Project

Construction & Commissioning, Detailed Design & EngineeringAug 2017
Preparation of project specific Commissioning deliverables including Procedures, Plans and completio

PDO Marmul Rationalization Project Commissioning

Construction & Commissioning, Detailed Design & EngineeringAug 2017
Preparation of project specific Commissioning deliverables including Procedures, Plans and completio

Oman Gas Company Commissioning

Construction & CommissioningAug 2017
Preparation of project specific Commissioning Procedures following OGC Commissioning & Start-up Proc

Daleel Polymer Injection Skid Commissioning, Operations & Maintenance Team 1 Year Contract

Construction & Commissioning, Operations & MaintenanceDec 2017
Manage the skid connections, followed by commissioning and operations at site. Maintenance challenge

PDO CRM Pre & Commissioning EI&C Team

Construction & CommissioningOct 2017
The plants which were modernized were the Saih Nihayda Gas Plant (SNGP) and the Saih Rawl Central Pr

PDO Marmul Central Control Room Construction Support Services

Construction & CommissioningOct 2017
Building a modern new Marmul Central Control Room to be the central control location for all marmul

PDO Marmul Central Control Room Construction Support Services

Construction & CommissioningOct 2017
Building a modern new Marmul Central Control Room to be the central control location for all marmul

PDO SNCP Commissioning C&I Team

Construction & CommissioningJun 2017
The Saih Nihayda condensate stabilization plant will be built near the Saih Nihayda gas plant in the

BP Khazan CPF Commissioning C&I Team

Construction & CommissioningMay 2017
Located on a previously undeveloped desert site 350 kilometres south of Muscat, work on the Khazzan

PDO Glass Point Solar Steam Phase 2 Commissioning

Construction & CommissioningApr 2017
Check all control, automation and instrumentation with pre-commissioning check sheets and commission

Qatar Shell Pearl GTL C&I Manpower Supply Services

Construction & Commissioning, Detailed Design & EngineeringMar 2017
Download all project logic, conduct conversions to new firmware software revisions, validate and upl

ORPIC Aromatics Control Room Shutdown

Construction & CommissioningFeb 2017
Relocate 4 control panels including the addition of junction boxes and extension power and instrumen

PDO Marmul Pump Replacement Commissioning Procedures & Planning

Construction & Commissioning, Detailed Design & EngineeringMar 2017
Preparation of project specific Commissioning deliverables including Procedures, Plans and completio

ORPIC Sohar Refinery Improvement Project (SRIP) Package 3 & 5 C&I Construction & Commissioning

Construction & CommissioningNov 2015
The Sohar Refinery Improvement Project (SRIP) is a multi-billion dollar project for Oman Oil Refiner

Qatar Petroleum Feed Stream Integration & Fiscal Metering Systems Installation Feed Stream Integration Commissioning

Construction & CommissioningSep 2015
A 2 part project for supervising the pre-commissioning activities and responsible for safe Commissio

Qatar Shell Pearl GTL PAS & ENMCS Systems Upgrade

Construction & Commissioning, Detailed Design & EngineeringSep 2015
Download all project logic, conduct conversions to new firmware software revisions, validate and upl

PDO Marmul Area Completions & Commissioning Services

Construction & CommissioningAug 2015
Commissioning Completions, Commissioning and Start-up for Several projects in the PDO Marmul Area co

Qatar Petroleum Khatiya Main to Khatiya South 20 Inch Pipeline Commissioning

Construction & CommissioningMay 2015
The objective of this project was to provide a new 20” Wet Gas bi-directional Pipeline between KM

PDO Amal Power Station HRSG Commissioning

Construction & CommissioningDec 2014
Amal power station is a 250MW simple cycle using two GE Frame 9E turbines has been constructed by Al

Venezuela Smithco Air Coolers Commissioning

Construction & CommissioningAug 2014
Commissioning and Start-up for Air Coolers at refinery.

PDO Zauliyah Pre-Start-up Audit

Construction & CommissioningJul 2014
Our PDO approved TA2 consultant participated in a Pre Start-up Audit (PSUA) for assurance that the p

OOCEP Abu Tabul Commissioning Management

Construction & CommissioningJun 2014
Confirm Mechanical Completion and then follow Pre-Commissioning Check Sheets.

Qatar Petroleum Burn Pit Migration Commissioning

Construction & CommissioningMay 2014
Preparation of Commissioning Risks Matrix, systemisation, commissioning procedures, pre-commissionin

PDO Qarn Alam Power Station Pre-Start-up Audit

Construction & CommissioningApr 2014
Our PDO approved TA2 consultant participated in a Pre Start-up Audit (PSUA) for assurance that the p

PDO Gas CCR Systems Integration

Construction & Commissioning, Detailed Design & Engineering, ImplementationFeb 2014
All Local and Regional Gas Control Rooms were unified at the new Gas CCR. All DCS systems Operator s

PDO Amal Power Station HRSG Commissioning Management

Construction & CommissioningOct 2013
Amal power station is a 250MW simple cycle using two GE Frame 9E turbines has been constructed by Al

PDO Qarn Alam Power Station Phase 3 Commissioning

Construction & CommissioningApr 2013
The power station was a 250MW simple cycle. Our engineers supported PDO in managing the third party

PDO Nimr Polymer Commissioning & Start-up

Construction & CommissioningJul 2013
PDO built a new Polymer Injection Trial Facility at Nimr-E for Polymer Flood Trials in the Nimr E oi

PDO Rabab Harwell Integrated (RHI) Commissioning & Start-up Services

Construction & CommissioningSep 2013
The project was to further develop the high pressure reservoirs to yield 110,000 bbl/d through misci

PDO Amal Steam Trials Pre-Start-up Audit

Construction & CommissioningDec 2012
Our PDO approved TA2 consultant participated in a Pre Start-up Audit (PSUA) for assurance that the p

PDO Harweel 2AB C&A Commissioning

Construction & CommissioningJun 2012
The project was to further develop the high pressure reservoirs to yield 110,000 bbl/d through misci

PDO Qarn Alum Power Station Commissioning Phase 1 & 2

Construction & CommissioningApr 2012
The power station was a 250MW simple cycle. Our engineers supported PDO in managing the third party

PDO Amal Power Station Commissioning Phase 2

Construction & CommissioningMar 2012
Amal power station is a 250MW simple cycle using two GE Frame 9E turbines has been constructed by Al

CCED Saiwan Engineering Services

Construction & Commissioning, ImplementationNov 2011
The project was split into an Early Development Facility where long term production testing can be i

Qatar Petroleum Filter Commissioning

Construction & CommissioningApr 2010
Abalto safely and successfully delivered commissioning procedures, conducted process commissioning a

Qatar Petroleum GTC 189/ED/03 EPIC of an independent Flare for QJA-1 & 2 and Replacement Separators at Dukhan Fields

Construction & Commissioning, Detailed Design & EngineeringApr 2005
Abalto safely and successfully delivered commissioning procedures, conducted process commissioning a

PDO Harweel EDF DCS & Safety Systems Commissioning, Start-up and Optimisation.

Construction & Commissioning, Detailed Design & EngineeringJan 2004
Harweel Early Development Facility (EDF) project was a USD 100 Million project for Petroleum Develop

Pringles Production Control & Automation System

Construction & Commissioning, Detailed Design & EngineeringOct 2003
Develop a complete control & automation system including PLC, SCADA and distributed VSD drive transp

Birkenhead BAFF Wash Plant Control System Upgrades

Construction & Commissioning, Detailed Design & EngineeringJun 2003
Validate and optimise the BAFF Backwash sequences for 8 cells at the Birkenhead Waste Water Treatmen

Stingray Sub Sea Power Generation Pilot Plant Control System on-site Engineering & Commissioning

Construction & Commissioning, Detailed Design & EngineeringMay 2003
Modifications to PLC and SCADA software for control of hydrofoil angel to optimise power generation.

Waste Water Treatment Works Sustainability Control System Upgrade

Construction & Commissioning, Detailed Design & Engineering, ImplementationApr 2003
Modifications to PLC Control System to include closed loop control for control valves.

Klampress Filtrate Control System

Construction & Commissioning, Detailed Design & Engineering, ImplementationOct 2002
Develop PLC control system software for a Klampress Filtrate Press including interlocks, interfacing

Chelmsford Sludge Pasteurisation Plant Control & Automation System Engineering, Commissioning & Start-up

Construction & Commissioning, Detailed Design & Engineering, ImplementationSep 2002
Control system and software design and development for a continuous batch process control of Sludge

Bromborough Remediation Control System Upgrade

Construction & Commissioning, Detailed Design & EngineeringAug 2002
Modifications to PLC Control System for best process control by conducting PID tuning of BAFF Plant

Bedford Imported Sludge Control System Upgrade

Construction & Commissioning, Detailed Design & Engineering, ImplementationAug 2002
Modifications to the control sequences for decanting imported sludge.

Great Billing Sludge Pasteurisation Plant Control & Automation System Engineering, Commissioning & Start-up

Construction & Commissioning, Detailed Design & Engineering, ImplementationJul 2002
Control system and software design and development for a continuous batch process control of Sludge

Bedford Sludge Pasteurisation Plant Control & Automation System Engineering, Commissioning & Start-up

Construction & Commissioning, Detailed Design & Engineering, ImplementationJun 2002
Control system and software design and development for a continuous batch process control of Sludge

Pernton & Newton SatCon Control System Communication Interfaces Modifications

Construction & Commissioning, Detailed Design & EngineeringMay 2002
Modifications to PLC control system communication module to send equipment status to SCADA

Cliff Quay Sludge Pasteurisation Plant Control & Automation System Engineering, Commissioning & Start-up

Construction & Commissioning, Detailed Design & Engineering, ImplementationApr 2002
Control system and software design and development for a continuous batch process control of Sludge

Cambridge Sludge Pasteurisation Plant Control & Automation System Engineering, Commissioning & Start-up

Construction & Commissioning, Detailed Design & Engineering, ImplementationMar 2002
Control system and software design and development for a continuous batch process control of Sludge

Skid Body Transport to Storage Upgrades

Construction & Commissioning, Detailed Design & EngineeringFeb 2002
Modifications to control system for Skid Body Transport to Storage including counting, Skid Identifi

Relocate Hoist Rail & Control System

Construction & Commissioning, Detailed Design & EngineeringJan 2002
Modifications to the controls for relocation of Hoist Rail Transport System including safety interlo

Caister Sludge Pasteurisation Plant Control & Automation System Engineering, Commissioning & Start-up

Construction & Commissioning, Detailed Design & Engineering, ImplementationJan 2002
Control system and software design and development for a continuous batch process control of Sludge

Chelmsford Imported Sludge Control System

Construction & Commissioning, Detailed Design & Engineering, ImplementationNov 2001
Modifications to the control sequences for decanting imported sludge.

Bromborough PLC & SCADA System Commissioning

Construction & Commissioning, Detailed Design & Engineering, ImplementationJun 2001
Commissioning for a complete 500 MLD Waste Water Treatment Works.

Spray Booth Effluent Treatment Plant Control System Upgrade

Construction & Commissioning, Detailed Design & Engineering, ImplementationJun 2001
Modifications to PLC controls for the Spray Booth Effluent Treatment Plant Purge and Back Wash Cycle

Kings Lynn Waste Water Treatment Works Control & Automation System

Construction & Commissioning, Detailed Design & Engineering, ImplementationMay 2001
Modification of SCADA scripts to make communications robust. Failure in field communications wiring

West Mersey Waste Water Treatment Works Control & Automation System

Construction & Commissioning, Detailed Design & EngineeringApr 2001
Modifications to PLC Control System for best process control by conducting PID tuning of BAFF Plant

King Lynn Waste Water Treatment Works Pulsed Xenon Ultraviolet Plant Control System

Construction & Commissioning, Detailed Design & Engineering, ImplementationMar 2001
Development of a control system for safeguard against cryptosporidium outbreaks using pulsed Xenon U

Chelmsford Waste Water Treatment Works SCADA System Upgrades

Construction & Commissioning, Detailed Design & Engineering, ImplementationMar 2001
Modify SCADA reports to client requirement to show and print daily, weekly and monthly production to

Spray Booth Drip Trays Control Systems Modifications

Construction & Commissioning, Detailed Design & EngineeringMar 2001
Modifications to the control systems for Drip Trays water cleaning systems for trickle and forced wa

Intumescent Paint Spray Booth Automation & Control System Upgrade

Construction & Commissioning, Detailed Design & Engineering, ImplementationMar 2001
Modifications to the Control & Automation System for Intumescent Paint Spray Booth for loading, entr

Newhaven Waste Water Treatment Works PICs Process Simulation System

Construction & Commissioning, Detailed Design & Engineering, ImplementationFeb 2001
Using P&IDs and process narrative Process Flow Charts were created which were then used to do the so

Pulsed Xenon Ultraviolet Pilot Plant Control System

Construction & Commissioning, Detailed Design & Engineering, ImplementationJan 2001
Development of a control system for safeguard against cryptosporidium outbreaks using pulsed Xenon U

Intumescent Paint Spray Booth Automation & Control System Commissioning & Start-up

Construction & Commissioning, Detailed Design & Engineering, ImplementationSep 2000
Installation of Control & Automation System for Intumescent Paint Spray Booth with loading, entry an

Bo’ness Waste Water Treatment Works Control Valves Modifications

Construction & Commissioning, Detailed Design & Engineering, ImplementationAug 2000
Modifications to PLC Control System for best process control by conducting PID tuning of all control

Underseal Spray Deck Modification to Control System

Construction & Commissioning, Detailed Design & Engineering, ImplementationJul 2000
Modifications to PLC Control System for an Wax Underseal Spray Deck to accommodate new car underbody

Exit to Audit Spur Control System Upgrade

Construction & Commissioning, Detailed Design & EngineeringMay 2000
Modifications to the PLC Control System Track Change Exit to Audit Spur with the addition of positio

Infra Red Oven Protection Control System

Construction & Commissioning, Detailed Design & EngineeringApr 2000
Modifications to the PLC Control System for Infra Red Oven protection by the addition of F&G Heat De

Cotton Valley Waste Water Treatment Works Control & Automation System

Construction & Commissioning, Detailed Design & EngineeringMar 2000
Modifications to the control system for a Waste Water Treatment Works including Buffer Tanks, Digest

Kawasaki Heavy Industries Tunnel Boring Machine Control System for Canary Wharf River Thames Crossing

Construction & Commissioning, Detailed Design & EngineeringJul 1999
Development of a PLC and HMI Control System for a Tunnel Boring Machine with controls for the Cutter

Bromborough Waste Water Treatment Works Control & Automation System

Construction & Commissioning, Detailed Design & EngineeringFeb 1999
This was a project to design & develop an end to end systems and software solution for the Bromborou

Wuxi Water Treatment Works Control & Automation System

Construction & Commissioning, Detailed Design & Engineering, ImplementationOct 1998
Specify, design, build the control system from User Requirements Specification for the end to end co

Harwich Waste Water Treatment Works Control & Automation System

Construction & Commissioning, Detailed Design & Engineering, ImplementationMay 1998
Modifications to the control system for a Waste Water Treatment Works including Buffer Tanks, Digest

Chelmsford Waste Water Treatment Works Control & Automation System

Construction & Commissioning, Detailed Design & Engineering, ImplementationApr 1998
Provision of a complete control system for the process control including Rotating Bar Interceptors,

Track Shoes Heat Treatment Furnaces Control & Automation System

Construction & Commissioning, Detailed Design & EngineeringFeb 1998
Provision of a full control & automation system for 2 Caterpillar Track Shoe Heat Treatment Furnaces

Kia Motors Reciprocator Paint Spray Booths

Construction & Commissioning, Detailed Design & EngineeringJan 1998
Development of PLC & SCADA control system for 2 Reciprocating Robots and Spray Booths water and air

Toyota Derby Junior Paint Mix Room control system modifications

Construction & Commissioning, Detailed Design & EngineeringJul 1997
Modifications control system for Air Handling and Mixing Systems in the Junior Paint Mix Room in Toy

Liuzhou Water Treatment Works Control & Automation System

Construction & Commissioning, Detailed Design & Engineering, ImplementationMar 1997
Control and automation systems including PLCs and SCADA systems delivered from client P&IDs and PFDs

Coventry Paint Booth Control System Upgrade

Construction & Commissioning, Detailed Design & EngineeringMar 1997
Upgrade of the PLC Control System for Colour Change Flushing sequences in Paint Booth at Renault in

Coleshill Waste Water Treatment Works Control System Upgrade

Construction & Commissioning, Detailed Design & Engineering, ImplementationFeb 1997
Upgrade the control system for timed control of Limitorque de-sludging valves with status feedback t

Coleshill Waste Water Treatment Works Control System

Construction & Commissioning, Detailed Design & Engineering, ImplementationApr 1996
Upgrade the PLC control for the addition of level controls to sludge pits pumping system.

Worchester Waste Water Treatment Works Control System Upgrade

Construction & Commissioning, Detailed Design & Engineering, ImplementationMar 1996
Upgrade the PLC Control for the addition of effluent tanks decanting values and level transmitters.

Gypsum Production Control System

Construction & Commissioning, Detailed Design & EngineeringJun 1995
Development of an automated Production Control System for Gypsum Boards with mixers, formers, Drying

Intumescent Paint Spray Booth Automation & Control System

Construction & Commissioning, Detailed Design & EngineeringApr 1995
Development of a Control & Automation System for Intumescent Paint Spray Booth with loading, entry a

Chocolate Shells Mixing Temperature Control System

Construction & Commissioning, Detailed Design & EngineeringJun 1994
Modifications to Allen Bradley 1769 PLC control software for temperature control of chocolate mixing

Actuator Control Communication System

Construction & Commissioning, Detailed Design & EngineeringFeb 1994
Development of a software using Visual Basic for a communication system for configuring and status f

Paint Shop and Mix Room Control System

Construction & Commissioning, Detailed Design & Engineering, ImplementationAug 1993
Full Paint Shop and Mix Room Control System including Paint Mix Room and 2 full Paint Lines.

BASS Brewers New Control & Automation System

Construction & Commissioning, Detailed Design & Engineering, ImplementationAug 1993
Batch production system for a brewery control & automation system for wort production, fermentation

Mayonnaise Mixer Automation

Construction & Commissioning, Detailed Design & EngineeringJun 1993
Modifications to PLC software for High Speed Mayonnaise Mixer interlocked with upstream ingredients

Radiator Heat Treatment Control System

Construction & Commissioning, Detailed Design & EngineeringMar 1993
Automation of welding, heat treatment, cooling, water fill and pressure testing with PLC & SCADA con

Oven Door Replacement Control System

Construction & Commissioning, Detailed Design & EngineeringFeb 1993
Modifications to PLC software Oven door replacement interlocked with track movement and fire detecti

Tooks Automated Dough Mixers

Construction & Commissioning, Detailed Design & Engineering, ImplementationOct 1991
PLC and SCADA control system for High Speed Automated Dough Mixers with recipes manager batching & c

CPECC Sonatrach Refinery Premabergo LPG & Propane Packages Commissioning & Start-up

Construction & Commissioning, Detailed Design & Engineering, ImplementationMar 2019
Premabergo was not able to commission the packages and we were approached to conduct this and provid

Roberts Automated Dough Mixers

Construction & Commissioning, Detailed Design & Engineering, ImplementationAug 1991
PLC and SCADA control system for High Speed Automated Dough Mixers with recipes manager batching & c

Manbrot Automated Dough Mixers

Construction & Commissioning, Detailed Design & Engineering, ImplementationJul 1991
PLC and SCADA control system for High Speed Automated Dough Mixers with recipes manager batching & c

Bokomo Automated Dough Mixers

Construction & Commissioning, Detailed Design & Engineering, ImplementationMay 1991
PLC and SCADA control system for High Speed Automated Dough Mixers with recipes manager batching & c

Automated Dough Mixers

Construction & Commissioning, Detailed Design & Engineering, ImplementationMar 1991
Writing a detailed Functional & Systems Design Specification, PLC software and SCADA screen Typicals

Re-Bar Bender 3

Construction & Commissioning, Detailed Design & Engineering, ImplementationDec 1990
Control panel design and software development and the build of control panel and cabling installatio

Shear Line 2

Construction & Commissioning, Detailed Design & Engineering, ImplementationNov 1990
Control panel design and software development and the build of control panel and cabling installatio

Re-Bar Bender 2

Construction & Commissioning, Detailed Design & Engineering, ImplementationAug 1990
Control panel design and software development and the build of control panel and cabling installatio

Shear Line 1

Construction & Commissioning, Detailed Design & Engineering, ImplementationJun 1990
Control panel design and software development and the build of control panel and cabling installatio

Re-Bar Bender 1

Construction & Commissioning, Detailed Design & Engineering, ImplementationApr 1990
Control panel design and software development and the build of control panel and cabling installatio

TheatreTech China Control & Automation System

Construction & Commissioning, Detailed Design & EngineeringFeb 1989
A project to complete the construction and commissioning for 2 performing arts theatres in Shenzhen

Binks Bullows Mini Paint Booth

Construction & Commissioning, Detailed Design & Engineering, ImplementationFeb 1988
Development of PLC control software for a mini paint spray booth for temperature and air flow contro

Rover Longbridge Chiller Control System

Construction & Commissioning, Detailed Design & EngineeringNov 1987
Refurbishment of chiller temperature control where chilled water was used for a pint mix room temper

Nissan Paint Shop Refurbishment

Construction & Commissioning, Detailed Design & Engineering, ImplementationAug 1987
Refurbishment of Derby plant paint shop to control colour selection, flow and pressure for delivery

Paint Mix Room Control System

Construction & Commissioning, Detailed Design & Engineering, ImplementationJun 1987
Paint mix room control of temperature, flow and pressure including colour change control for deliver

07. As Built Documentation Download

Abalto recognises the critical role of accurate documentation in the operation and maintenance of industrial control systems. Our As-Built Documentation services offer a comprehensive solution, including expert site surveys to update or create drawings and documents based on Red Line Mark Up data. We specialise in As-Built Dossiers, ensuring precision and accuracy. With experience in both green field (new construction) and brown field (modification or expansion of existing facilities) projects, we understand the importance of As-Built documentation for design inputs, benefiting production plants and EPC companies. Trust Abalto for meticulous As-Built services that ensure the seamless operation and maintenance of your control systems.

Here’s why you should choose us for your As-Built services

At Abalto, we stand out as the premier choice for your As-Built documentation needs. Our commitment to excellence, attention to detail, and state-of-the-art approach set us apart.

Choose Abalto for As-Built services that exceed expectations and ensure the accuracy and integrity of your industrial control system documentation for your project requirements and discover how our services can accurate Plant Operating Manuals.

Tailored Services for Your Unique Needs

We understand that every project is unique. That’s why we offer a range of As-Built services specifically designed to meet your individual requirements. From updating CAD drawings to conducting site surveys, our services are tailored to ensure that your documentation accurately reflects the physical installations of your industrial control systems.

Precision Through Meticulous Site Surveys

Our team excels in conducting efficient and meticulous site surveys. We leave no stone unturned, ensuring that all marked-up documents and drawings are identified. This dedication to detail guarantees that no critical information is overlooked, providing you with a comprehensive and accurate representation of your systems.

Comprehensive Component Identification

During our site surveys, we go beyond the basics. We record equipment tags and part numbers, creating a comprehensive record of every component within your system. This meticulous approach enhances the integrity of your documentation, making it an invaluable resource for your operations.

Enhanced Documentation Completeness

We recognize the importance of data sheets in comprehensive As-Built documentation. Our team gathers relevant data sheets to include in your As-Built Documentation Dossier. This inclusion enhances the completeness of your documentation, ensuring that you have all the information you need at your fingertips.

Leveraging Cutting-Edge Technology

At Abalto, we’re committed to staying at the forefront of technology. We leverage the latest licensed technology tools to streamline and enhance our As-Built services. By doing so, we reduce the time and effort required for site surveys while maintaining an unparalleled level of accuracy.

A Trusted Partner for Your As-Built Needs

With Abalto, you’re not just getting a service provider; you’re gaining a trusted partner. Our expertise, attention to detail, and commitment to precision make us the ideal choice for your As-Built documentation requirements.

View Projects

Filter projects by:

  • Secondary Service
  • Industry
  • Client
  • Status
  • ApplyReset

Sort projects by:

  • 123projects executed
  • 739878person hours
  • 27197548contracts value ($)

Redundant Equipment Demolition Detailed Design

Construction & Commissioning, Detailed Design & EngineeringDec 2022
Redundant Assets DPS, BBS Demolition Design

Salalah Methanol Electrical, Instrumentation & Telecom E&F Area

Construction & CommissioningJun 2019
Salalah liquefied petroleum gas (SLPG) project is being developed in Dhofar, southern Oman, by Oman

Multi Discipline Engineering Services

Construction & Commissioning, Detailed Design & EngineeringJan 2023
Manpower Provision for Discipline Engineers

Senior Commissioning Engineer

Construction & CommissioningAug 2022
Provision of Senior Commissioning Engineer

Instrument Air Systems Adequacy Check

Construction & Commissioning, Detailed Design & EngineeringJul 2022
Instrument Air Systems Adequacy Check

Tender-27 Daleel Stations 3D Modelling PDMS

Construction & Commissioning, Detailed Design & EngineeringJul 2022
Daleel Stations 3D Modelling

Tibra Red Lined Markup PEFS

Construction & Commissioning, Detailed Design & EngineeringJun 2022
Red Line Markup PEFS for Tibr Haushi Development Project Phase 2A

Daleel Tender-28 Asset Registry

Construction & Commissioning, Detailed Design & EngineeringFeb 2022
Asset Register development for New Burners Replacement at DPS Project.

Sayyala, Suwaihat & Rima Pipeline As-Built

Construction & CommissioningJun 2021
As-Built for pipelines including RLMU checks

AOTC Instrument Technicians for OQ LPG Project

Construction & CommissioningJun 2021
Manpower supply for Construction & Commissioning

SNC Manpower

Construction & CommissioningMay 2021
Manpower supply for Construction, Commissioning & Start-up

Daleel Tender 21 Asset Registry

Construction & Commissioning, Detailed Design & EngineeringMay 2021
Asset Register development for AP/LP Flare, Test Separators & Dehydration Tanks Pumps.

Daleel Tender 18 Asset Registry & As-Built

Construction & CommissioningFeb 2021
Generation of templates including Asset templates, Attribute templates, BOM templates, and Maintenan

PDO As-Built & Manpower Call of Rates

Construction & CommissioningJan 2021
PDO FEED Office Engineering & Services support Sub-Contract Services for As-Built in scope of work,

PDO Fahud Gas Compression-RLMU

Construction & CommissioningDec 2020
SRF 561 Fahud Gas Compression Red Line Mark Up Verification

PDO Nimr E Polymer Spare Parts

Construction & CommissioningNov 2020
Nimr E Polymer Injection Facility various equipment Spare Parts Supply

Daleel Site Survey

Construction & Commissioning, Detailed Design & EngineeringNov 2020
Conduct a site survey and verify that all site equipment is captured on Master Drawings, producing M

GGP Rejuvenation Project RLMU As-Built

Construction & CommissioningNov 2020
GGP Rejuvenation including Site Survey, Red Line Mark Up (RLMU) Development, As-Built and CAD develo

PDO Sakhar As-Built Documentation

Construction & CommissioningJun 2020
Greater Taliah Phase 3 (Sakhar) As-Built

Modernization of Control Room

Construction & Commissioning, Detailed Design & EngineeringSep 2020
Design, Engineering, demolition, installation, commissioning & startup with parallel operations for

E&I for Salalah Methanol and Ammonia Plant

Construction & CommissioningApr 2020
Manpower supply for Construction & Commissioning

PDO MOV replacement project

Construction & CommissioningApr 2020
RLMU MOV Replacement

PDO As-Built Amal 2A West Project

Construction & CommissioningMar 2020
Amal 2A West-Re-routing and Demolition of Cold Producers

PDO SNCP As-Built

Construction & CommissioningNov 2019
Preparation of As-Built drawings inline with PDO standard procedures for 3D modelling & SPI

Yibal Khuff E&I On Plot

Construction & CommissioningSep 2019
Manpower supply for Construction & Commissioning

PDO Camp Substation Commissioning

Construction & Commissioning, Detailed Design & EngineeringJan 2019
Preparation of project specific Commissioning deliverables including Procedures, Plans and completio

PDO Greater Birba Well Head Hydraulic Control Panel Maintenance Technicians Team

Construction & CommissioningFeb 2018
Conduct a site survey of all Well Heads and determine the Well Head Control Panels (WHCP) that are n

PDO Birba Changeover Site Activities

Construction & CommissioningMay 2018
PDO decided to upgrade the old Birba Cluster and started with a FEED and Detailed Design done by Aba

Salalah IPP Metering Stations

Construction & CommissioningAug 2017
Preparation of project specific Commissioning Procedures following OGC Commissioning & Start-up Proc

Salalah Methanol Company Control Room Upgrade Phase 1

Construction & CommissioningMay 2018
Installation of Control & Automation System for SMC new control room including Lighting, Desks, Cabl

PDO Al Huwaisa As-Built Documentation

Construction & CommissioningApr 2018
Preparation of As-Built drawings inline with PDO standard procedures Develop design drawings require

PDO Qaharir Site Commissioning Control Room Upgrade Project

Construction & Commissioning, Detailed Design & EngineeringAug 2017
Preparation of project specific Commissioning deliverables including Procedures, Plans and completio

PDO Marmul Rationalization Project Commissioning

Construction & Commissioning, Detailed Design & EngineeringAug 2017
Preparation of project specific Commissioning deliverables including Procedures, Plans and completio

PDO GGP Rejuvenation As-Built Documentation

Construction & CommissioningFeb 2018
Preparation of As-built drawings inline with PDO standard procedures Develop design drawings require

Oman Gas Company Commissioning

Construction & CommissioningAug 2017
Preparation of project specific Commissioning Procedures following OGC Commissioning & Start-up Proc

Daleel Polymer Injection Skid Commissioning, Operations & Maintenance Team 1 Year Contract

Construction & Commissioning, Operations & MaintenanceDec 2017
Manage the skid connections, followed by commissioning and operations at site. Maintenance challenge

PDO CRM Pre & Commissioning EI&C Team

Construction & CommissioningOct 2017
The plants which were modernized were the Saih Nihayda Gas Plant (SNGP) and the Saih Rawl Central Pr

PDO Marmul Central Control Room Construction Support Services

Construction & CommissioningOct 2017
Building a modern new Marmul Central Control Room to be the central control location for all marmul

PDO Marmul Central Control Room Construction Support Services

Construction & CommissioningOct 2017
Building a modern new Marmul Central Control Room to be the central control location for all marmul

PDO SNCP Commissioning C&I Team

Construction & CommissioningJun 2017
The Saih Nihayda condensate stabilization plant will be built near the Saih Nihayda gas plant in the

BP Khazan CPF Commissioning C&I Team

Construction & CommissioningMay 2017
Located on a previously undeveloped desert site 350 kilometres south of Muscat, work on the Khazzan

Qatar Petroleum NGL-2 De-Commissioning

Construction & Commissioning, Detailed Design & EngineeringMay 2017
Preparation of De-Commissioning Risks Matrix, de-commissioning procedures and check lists and conduc

PDO Glass Point Solar Steam Phase 2 Commissioning

Construction & CommissioningApr 2017
Check all control, automation and instrumentation with pre-commissioning check sheets and commission

ORPIC Sohar Refinery Improvement Project Ozone Instrumentation As-Built Data Sheets

Construction & CommissioningFeb 2017
Site survey to capture all Instruments Tag and serial numbers followed by search for Data Sheets and

ORPIC Aromatics Control Room Shutdown

Construction & CommissioningFeb 2017
Relocate 4 control panels including the addition of junction boxes and extension power and instrumen

PDO Marmul Pump Replacement Commissioning Procedures & Planning

Construction & Commissioning, Detailed Design & EngineeringMar 2017
Preparation of project specific Commissioning deliverables including Procedures, Plans and completio

PDO Birba Control Systems Revamp Detailed Design

Construction & Commissioning, Detailed Design & EngineeringJul 2016
PDO decided to upgrade the old Birba Cluster and started with FEED that was done by Abalto through I

ORPIC Sohar Refinery Improvement Project (SRIP) Package 3 & 5 C&I Construction & Commissioning

Construction & CommissioningNov 2015
The Sohar Refinery Improvement Project (SRIP) is a multi-billion dollar project for Oman Oil Refiner

Qatar Petroleum Feed Stream Integration & Fiscal Metering Systems Installation Feed Stream Integration Commissioning

Construction & CommissioningSep 2015
A 2 part project for supervising the pre-commissioning activities and responsible for safe Commissio

Qatar Shell Pearl GTL PAS & ENMCS Systems Upgrade

Construction & Commissioning, Detailed Design & EngineeringSep 2015
Download all project logic, conduct conversions to new firmware software revisions, validate and upl

PDO Marmul Area Completions & Commissioning Services

Construction & CommissioningAug 2015
Commissioning Completions, Commissioning and Start-up for Several projects in the PDO Marmul Area co

Qatar Petroleum Khatiya Main to Khatiya South 20 Inch Pipeline Commissioning

Construction & CommissioningMay 2015
The objective of this project was to provide a new 20” Wet Gas bi-directional Pipeline between KM

PDO Gas CCR Systems Integration

Construction & Commissioning, Detailed Design & Engineering, ImplementationFeb 2014
All Local and Regional Gas Control Rooms were unified at the new Gas CCR. All DCS systems Operator s

PDO Amal Power Station HRSG Commissioning Management

Construction & CommissioningOct 2013
Amal power station is a 250MW simple cycle using two GE Frame 9E turbines has been constructed by Al

PDO Qarn Alam Power Station Phase 3 Commissioning

Construction & CommissioningApr 2013
The power station was a 250MW simple cycle. Our engineers supported PDO in managing the third party

PDO Nimr Polymer Commissioning & Start-up

Construction & CommissioningJul 2013
PDO built a new Polymer Injection Trial Facility at Nimr-E for Polymer Flood Trials in the Nimr E oi

PDO Rabab Harwell Integrated (RHI) Commissioning & Start-up Services

Construction & CommissioningSep 2013
The project was to further develop the high pressure reservoirs to yield 110,000 bbl/d through misci

PDO DACA Cyber Security Upgrades

Construction & Commissioning, Consultancy, Detailed Design & EngineeringJun 2013
Follow PDO specific DCADA System Hardening measures for all Control Systems Servers, Operator and En

PDO Harweel 2AB C&A Commissioning

Construction & CommissioningJun 2012
The project was to further develop the high pressure reservoirs to yield 110,000 bbl/d through misci

PDO Qarn Alum Power Station Commissioning Phase 1 & 2

Construction & CommissioningApr 2012
The power station was a 250MW simple cycle. Our engineers supported PDO in managing the third party

PDO Amal Power Station Commissioning Phase 2

Construction & CommissioningMar 2012
Amal power station is a 250MW simple cycle using two GE Frame 9E turbines has been constructed by Al

CCED Saiwan Engineering Services

Construction & Commissioning, ImplementationNov 2011
The project was split into an Early Development Facility where long term production testing can be i

Qatar Petroleum Filter Commissioning

Construction & CommissioningApr 2010
Abalto safely and successfully delivered commissioning procedures, conducted process commissioning a

Qatar Petroleum GTC 189/ED/03 EPIC of an independent Flare for QJA-1 & 2 and Replacement Separators at Dukhan Fields

Construction & Commissioning, Detailed Design & EngineeringApr 2005
Abalto safely and successfully delivered commissioning procedures, conducted process commissioning a

PDO Harweel EDF DCS & Safety Systems Commissioning, Start-up and Optimisation.

Construction & Commissioning, Detailed Design & EngineeringJan 2004
Harweel Early Development Facility (EDF) project was a USD 100 Million project for Petroleum Develop

Saudi Aramco Offshore Safety, RTU & SCADA System Factory Acceptance Testing

Construction & Commissioning, Detailed Design & Engineering, ImplementationDec 2003
Wiring and set up of all RTU and Safety control panels and SCADA system followed by IO and functiona

Scanning Power Transmission Contracts & Maps

Construction & Commissioning, Detailed Design & EngineeringNov 2003
Bar Code IDs attached to each of the 2,000,000 archived contracts followed by bulk scanning, uploadi

Pringles Production Control & Automation System

Construction & Commissioning, Detailed Design & EngineeringOct 2003
Develop a complete control & automation system including PLC, SCADA and distributed VSD drive transp

Schlumberger Wire Line Tool Communication System

Construction & Commissioning, Detailed Design & Engineering, ImplementationJun 2003
Develop software in Visual Basic embedded in PC based RS232 communication module for a Wire Line Too

Birkenhead BAFF Wash Plant Control System Upgrades

Construction & Commissioning, Detailed Design & EngineeringJun 2003
Validate and optimise the BAFF Backwash sequences for 8 cells at the Birkenhead Waste Water Treatmen

Stingray Sub Sea Power Generation Pilot Plant Control System on-site Engineering & Commissioning

Construction & Commissioning, Detailed Design & EngineeringMay 2003
Modifications to PLC and SCADA software for control of hydrofoil angel to optimise power generation.

Waste Water Treatment Works Sustainability Control System Upgrade

Construction & Commissioning, Detailed Design & Engineering, ImplementationApr 2003
Modifications to PLC Control System to include closed loop control for control valves.

Klampress Filtrate Control System

Construction & Commissioning, Detailed Design & Engineering, ImplementationOct 2002
Develop PLC control system software for a Klampress Filtrate Press including interlocks, interfacing

Chelmsford Sludge Pasteurisation Plant Control & Automation System Engineering, Commissioning & Start-up

Construction & Commissioning, Detailed Design & Engineering, ImplementationSep 2002
Control system and software design and development for a continuous batch process control of Sludge

Bromborough Remediation Control System Upgrade

Construction & Commissioning, Detailed Design & EngineeringAug 2002
Modifications to PLC Control System for best process control by conducting PID tuning of BAFF Plant

Bedford Imported Sludge Control System Upgrade

Construction & Commissioning, Detailed Design & Engineering, ImplementationAug 2002
Modifications to the control sequences for decanting imported sludge.

Great Billing Sludge Pasteurisation Plant Control & Automation System Engineering, Commissioning & Start-up

Construction & Commissioning, Detailed Design & Engineering, ImplementationJul 2002
Control system and software design and development for a continuous batch process control of Sludge

Bedford Sludge Pasteurisation Plant Control & Automation System Engineering, Commissioning & Start-up

Construction & Commissioning, Detailed Design & Engineering, ImplementationJun 2002
Control system and software design and development for a continuous batch process control of Sludge

Pernton & Newton SatCon Control System Communication Interfaces Modifications

Construction & Commissioning, Detailed Design & EngineeringMay 2002
Modifications to PLC control system communication module to send equipment status to SCADA

Cliff Quay Sludge Pasteurisation Plant Control & Automation System Engineering, Commissioning & Start-up

Construction & Commissioning, Detailed Design & Engineering, ImplementationApr 2002
Control system and software design and development for a continuous batch process control of Sludge

Cambridge Sludge Pasteurisation Plant Control & Automation System Engineering, Commissioning & Start-up

Construction & Commissioning, Detailed Design & Engineering, ImplementationMar 2002
Control system and software design and development for a continuous batch process control of Sludge

Caister Sludge Pasteurisation Plant Control & Automation System Engineering, Commissioning & Start-up

Construction & Commissioning, Detailed Design & Engineering, ImplementationJan 2002
Control system and software design and development for a continuous batch process control of Sludge

Chelmsford Imported Sludge Control System

Construction & Commissioning, Detailed Design & Engineering, ImplementationNov 2001
Modifications to the control sequences for decanting imported sludge.

Bromborough PLC & SCADA System Commissioning

Construction & Commissioning, Detailed Design & Engineering, ImplementationJun 2001
Commissioning for a complete 500 MLD Waste Water Treatment Works.

Spray Booth Effluent Treatment Plant Control System Upgrade

Construction & Commissioning, Detailed Design & Engineering, ImplementationJun 2001
Modifications to PLC controls for the Spray Booth Effluent Treatment Plant Purge and Back Wash Cycle

Kings Lynn Waste Water Treatment Works Control & Automation System

Construction & Commissioning, Detailed Design & Engineering, ImplementationMay 2001
Modification of SCADA scripts to make communications robust. Failure in field communications wiring

West Mersey Waste Water Treatment Works Control & Automation System

Construction & Commissioning, Detailed Design & EngineeringApr 2001
Modifications to PLC Control System for best process control by conducting PID tuning of BAFF Plant

King Lynn Waste Water Treatment Works Pulsed Xenon Ultraviolet Plant Control System

Construction & Commissioning, Detailed Design & Engineering, ImplementationMar 2001
Development of a control system for safeguard against cryptosporidium outbreaks using pulsed Xenon U

Chelmsford Waste Water Treatment Works SCADA System Upgrades

Construction & Commissioning, Detailed Design & Engineering, ImplementationMar 2001
Modify SCADA reports to client requirement to show and print daily, weekly and monthly production to

Spray Booth Drip Trays Control Systems Modifications

Construction & Commissioning, Detailed Design & EngineeringMar 2001
Modifications to the control systems for Drip Trays water cleaning systems for trickle and forced wa

Newhaven Waste Water Treatment Works PICs Process Simulation System

Construction & Commissioning, Detailed Design & Engineering, ImplementationFeb 2001
Using P&IDs and process narrative Process Flow Charts were created which were then used to do the so

Pulsed Xenon Ultraviolet Pilot Plant Control System

Construction & Commissioning, Detailed Design & Engineering, ImplementationJan 2001
Development of a control system for safeguard against cryptosporidium outbreaks using pulsed Xenon U

Bo’ness Waste Water Treatment Works Control Valves Modifications

Construction & Commissioning, Detailed Design & Engineering, ImplementationAug 2000
Modifications to PLC Control System for best process control by conducting PID tuning of all control

Exit to Audit Spur Control System Upgrade

Construction & Commissioning, Detailed Design & EngineeringMay 2000
Modifications to the PLC Control System Track Change Exit to Audit Spur with the addition of positio

Infra Red Oven Protection Control System

Construction & Commissioning, Detailed Design & EngineeringApr 2000
Modifications to the PLC Control System for Infra Red Oven protection by the addition of F&G Heat De

Cotton Valley Waste Water Treatment Works Control & Automation System

Construction & Commissioning, Detailed Design & EngineeringMar 2000
Modifications to the control system for a Waste Water Treatment Works including Buffer Tanks, Digest

Kawasaki Heavy Industries Tunnel Boring Machine Control System for Canary Wharf River Thames Crossing

Construction & Commissioning, Detailed Design & EngineeringJul 1999
Development of a PLC and HMI Control System for a Tunnel Boring Machine with controls for the Cutter

Bromborough Waste Water Treatment Works Control & Automation System

Construction & Commissioning, Detailed Design & EngineeringFeb 1999
This was a project to design & develop an end to end systems and software solution for the Bromborou

Wuxi Water Treatment Works Control & Automation System

Construction & Commissioning, Detailed Design & Engineering, ImplementationOct 1998
Specify, design, build the control system from User Requirements Specification for the end to end co

Harwich Waste Water Treatment Works Control & Automation System

Construction & Commissioning, Detailed Design & Engineering, ImplementationMay 1998
Modifications to the control system for a Waste Water Treatment Works including Buffer Tanks, Digest

Chelmsford Waste Water Treatment Works Control & Automation System

Construction & Commissioning, Detailed Design & Engineering, ImplementationApr 1998
Provision of a complete control system for the process control including Rotating Bar Interceptors,

Track Shoes Heat Treatment Furnaces Control & Automation System

Construction & Commissioning, Detailed Design & EngineeringFeb 1998
Provision of a full control & automation system for 2 Caterpillar Track Shoe Heat Treatment Furnaces

Kia Motors Reciprocator Paint Spray Booths

Construction & Commissioning, Detailed Design & EngineeringJan 1998
Development of PLC & SCADA control system for 2 Reciprocating Robots and Spray Booths water and air

Toyota Derby Junior Paint Mix Room control system modifications

Construction & Commissioning, Detailed Design & EngineeringJul 1997
Modifications control system for Air Handling and Mixing Systems in the Junior Paint Mix Room in Toy

Liuzhou Water Treatment Works Control & Automation System

Construction & Commissioning, Detailed Design & Engineering, ImplementationMar 1997
Control and automation systems including PLCs and SCADA systems delivered from client P&IDs and PFDs

Coventry Paint Booth Control System Upgrade

Construction & Commissioning, Detailed Design & EngineeringMar 1997
Upgrade of the PLC Control System for Colour Change Flushing sequences in Paint Booth at Renault in

Coleshill Waste Water Treatment Works Control System Upgrade

Construction & Commissioning, Detailed Design & Engineering, ImplementationFeb 1997
Upgrade the control system for timed control of Limitorque de-sludging valves with status feedback t

Coleshill Waste Water Treatment Works Control System

Construction & Commissioning, Detailed Design & Engineering, ImplementationApr 1996
Upgrade the PLC control for the addition of level controls to sludge pits pumping system.

Worchester Waste Water Treatment Works Control System Upgrade

Construction & Commissioning, Detailed Design & Engineering, ImplementationMar 1996
Upgrade the PLC Control for the addition of effluent tanks decanting values and level transmitters.

Gypsum Production Control System

Construction & Commissioning, Detailed Design & EngineeringJun 1995
Development of an automated Production Control System for Gypsum Boards with mixers, formers, Drying

Intumescent Paint Spray Booth Automation & Control System

Construction & Commissioning, Detailed Design & EngineeringApr 1995
Development of a Control & Automation System for Intumescent Paint Spray Booth with loading, entry a

Chocolate Shells Mixing Temperature Control System

Construction & Commissioning, Detailed Design & EngineeringJun 1994
Modifications to Allen Bradley 1769 PLC control software for temperature control of chocolate mixing

Actuator Control Communication System

Construction & Commissioning, Detailed Design & EngineeringFeb 1994
Development of a software using Visual Basic for a communication system for configuring and status f

Paint Shop and Mix Room Control System

Construction & Commissioning, Detailed Design & Engineering, ImplementationAug 1993
Full Paint Shop and Mix Room Control System including Paint Mix Room and 2 full Paint Lines.

BASS Brewers New Control & Automation System

Construction & Commissioning, Detailed Design & Engineering, ImplementationAug 1993
Batch production system for a brewery control & automation system for wort production, fermentation

Radiator Heat Treatment Control System

Construction & Commissioning, Detailed Design & EngineeringMar 1993
Automation of welding, heat treatment, cooling, water fill and pressure testing with PLC & SCADA con

Oven Door Replacement Control System

Construction & Commissioning, Detailed Design & EngineeringFeb 1993
Modifications to PLC software Oven door replacement interlocked with track movement and fire detecti

Tooks Automated Dough Mixers

Construction & Commissioning, Detailed Design & Engineering, ImplementationOct 1991
PLC and SCADA control system for High Speed Automated Dough Mixers with recipes manager batching & c

Roberts Automated Dough Mixers

Construction & Commissioning, Detailed Design & Engineering, ImplementationAug 1991
PLC and SCADA control system for High Speed Automated Dough Mixers with recipes manager batching & c

Manbrot Automated Dough Mixers

Construction & Commissioning, Detailed Design & Engineering, ImplementationJul 1991
PLC and SCADA control system for High Speed Automated Dough Mixers with recipes manager batching & c

Bokomo Automated Dough Mixers

Construction & Commissioning, Detailed Design & Engineering, ImplementationMay 1991
PLC and SCADA control system for High Speed Automated Dough Mixers with recipes manager batching & c

Automated Dough Mixers

Construction & Commissioning, Detailed Design & Engineering, ImplementationMar 1991
Writing a detailed Functional & Systems Design Specification, PLC software and SCADA screen Typicals

TheatreTech China Control & Automation System

Construction & Commissioning, Detailed Design & EngineeringFeb 1989
A project to complete the construction and commissioning for 2 performing arts theatres in Shenzhen

08. Manpower Supply Download

We have the expertise to provide a complete range of manpower services for large-scale projects. Our skilled workforce excels in plant construction and commissioning activities, handling everything from equipment installation to electrical systems, control, instrumentation, and automation.

With a deep understanding of the intricacies of large-scale projects, we provide comprehensive on-site services that encompass the full spectrum of construction and commissioning needs. This includes skilled tradespeople, technicians, engineers, and specialists across various disciplines. Our holistic approach to on-site construction and commissioning ensures that your project progresses efficiently, meeting all quality and safety standards. Abalto is your trusted partner in delivering large oil and gas facilities, where we not only document but also execute with precision and dedication.

Why Choose Abalto for Your Manpower Supply Needs in Construction & Commissioning?

At Abalto, we stand out as a trusted partner in enhancing operational efficiency through specialized manpower supply services for construction and commissioning. Choose Abalto as your partner in construction and commissioning manpower supply, and experience the difference that excellence can make in the success of your projects.

Here are the reasons why you should choose us:

Expertise in Large-Scale Projects

We possess the expertise to provide a comprehensive range of manpower services tailored for large-scale projects. Our skilled workforce excels in every aspect of plant construction and commissioning, from equipment installation to electrical systems, control, instrumentation, and automation.

Deep Understanding of Complex Projects

Our profound understanding of the intricacies involved in large-scale projects sets us apart. We offer holistic on-site services that cover the entire spectrum of construction and commissioning requirements, including skilled tradespeople, technicians, engineers, and specialists from diverse disciplines.

Holistic Approach for Efficiency

Abalto’s holistic approach ensures that your project progresses efficiently, meeting all quality and safety standards. We streamline every aspect of on-site construction and commissioning, ensuring seamless coordination among different teams and disciplines.

Proven Procedures for Reliability

Our suite of established procedures provides a solid foundation for managing inspection, maintenance, and repair programs. This ensures consistent and reliable performance from your facilities, contributing to operational excellence.

Unwavering Dedication to Excellence

At Abalto, we are deeply committed to delivering excellence in every facet of our services. From meticulous planning and precise execution to unwavering support and continuous improvement, our dedication shines through in every project we undertake.

View Projects

Filter projects by:

  • Secondary Service
  • Industry
  • Client
  • Status
  • ApplyReset

Sort projects by:

  • 28projects executed
  • 538085person hours
  • 17541091contracts value ($)

Redundant Equipment Demolition Detailed Design

Construction & Commissioning, Detailed Design & EngineeringDec 2022
Redundant Assets DPS, BBS Demolition Design

Senior Commissioning Engineer, Technicians & Operators

Construction & CommissioningFeb 2023
Site Manpower Services

Salalah Methanol Electrical, Instrumentation & Telecom E&F Area

Construction & CommissioningJun 2019
Salalah liquefied petroleum gas (SLPG) project is being developed in Dhofar, southern Oman, by Oman

Multi Discipline Engineering Services

Construction & Commissioning, Detailed Design & EngineeringJan 2023
Manpower Provision for Discipline Engineers

Senior Commissioning Engineer

Construction & CommissioningAug 2022
Provision of Senior Commissioning Engineer

Duqm Refinery Commissioning

Construction & CommissioningJul 2022
Manpower Provision for: Commissioning Engineer Commissioning Technician

Supply of Manpower (OQ Project)

Construction & CommissioningJun 2022
Manpower Provision for: E&I Technician Electrical Technician Instrument Technician

Greater Birba Station Operators

Construction & CommissioningJun 2022
Greater Birba Station Operators

Senior Commissioning Engineer

Construction & CommissioningNov 2021
Senior Commissioning engineer

Daleel Commissioning Engineer

Construction & CommissioningJun 2021
Commissioning engineer services of additional separation project

PDO Marmul Manpower Supply for Permit Holders

Construction & CommissioningApr 2021
Instrument & Electrical Permit Holders

AOTC Instrument Technicians for OQ LPG Project

Construction & CommissioningJun 2021
Manpower supply for Construction & Commissioning

SNC Manpower

Construction & CommissioningMay 2021
Manpower supply for Construction, Commissioning & Start-up

E&I for Salalah Methanol and Ammonia Plant

Construction & CommissioningApr 2020
Manpower supply for Construction & Commissioning

PDO As-Built Amal 2A West Project

Construction & CommissioningMar 2020
Amal 2A West-Re-routing and Demolition of Cold Producers

Manpower for Tayseer EDF OPS Activities

Construction & CommissioningOct 2019
Operation & Maintenance Assistance

Yibal Khuff E&I On Plot

Construction & CommissioningSep 2019
Manpower supply for Construction & Commissioning

PDO Greater Birba Well Head Hydraulic Control Panel Maintenance Technicians Team

Construction & CommissioningFeb 2018
Conduct a site survey of all Well Heads and determine the Well Head Control Panels (WHCP) that are n

PDO Birba Changeover Site Activities

Construction & CommissioningMay 2018
PDO decided to upgrade the old Birba Cluster and started with a FEED and Detailed Design done by Aba

Salalah Methanol Company Control Room Upgrade Phase 1

Construction & CommissioningMay 2018
Installation of Control & Automation System for SMC new control room including Lighting, Desks, Cabl

Daleel Polymer Injection Skid Commissioning, Operations & Maintenance Team 1 Year Contract

Construction & Commissioning, Operations & MaintenanceDec 2017
Manage the skid connections, followed by commissioning and operations at site. Maintenance challenge

PDO CRM Pre & Commissioning EI&C Team

Construction & CommissioningOct 2017
The plants which were modernized were the Saih Nihayda Gas Plant (SNGP) and the Saih Rawl Central Pr

PDO SNCP Commissioning C&I Team

Construction & CommissioningJun 2017
The Saih Nihayda condensate stabilization plant will be built near the Saih Nihayda gas plant in the

BP Khazan CPF Commissioning C&I Team

Construction & CommissioningMay 2017
Located on a previously undeveloped desert site 350 kilometres south of Muscat, work on the Khazzan

PDO Glass Point Solar Steam Phase 2 Commissioning

Construction & CommissioningApr 2017
Check all control, automation and instrumentation with pre-commissioning check sheets and commission

Project Administration Assistance

Construction & Commissioning, ManagementSep 2014
Organising project technical files and reports for project expenditure against budgets.

CCED Saiwan Engineering Services

Construction & Commissioning, ImplementationNov 2011
The project was split into an Early Development Facility where long term production testing can be i

Scanning Power Transmission Contracts & Maps

Construction & Commissioning, Detailed Design & EngineeringNov 2003
Bar Code IDs attached to each of the 2,000,000 archived contracts followed by bulk scanning, uploadi