Qatar Petroleum Khatiya Main to Khatiya South 20 Inch Pipeline Commissioning

The objective of this project was to provide a new 20” Wet Gas bi-directional Pipeline between KM and KS with associated facilities to avoid flaring by delivering 1st stage gas at KM to KS and vice versa during outage of gas compressor at KM or LP dehydration unit at KS.

Pre-commissioning supervision, Commissioning, Start-up and Handover processes for Khatiya Main to Khatiya South Pipeline Project. Our Commissioning Engineers performed problem free commissioning by following structured methodologies and procedures, drawing on lessons learned, identifying and mitigating possible risks.

Project Details

  • Contract No. C206
  • Primary Service Construction & Commissioning
  • Industry Oil & Gas
  • Secondary Service As Built Documentation, Commissioning Management, Pre-Commissioning & Commissioning, Start Up Audit Start Up & Process Optimisation
  • Client Qatar Petroleum
  • Start Date May 2015
  • Consultant or EPC Panorama Contracting and Engineering Services
  • Contract Value ($) 39600
  • Project Location Al Khubaib St, Doha, Qatar
  • Person Hours 510
  • Execution Office Muscat, Sultanate of Oman
  • Status Completed

Scope of work

    Pre-commissioning, Commissioning, Start-up and Handover processes for a EPIC project for Installation of 20” Wet Gas Pipeline Between Khatiya Main (KM) & Khatiya South (KS) a multi-million USD project for Qatar Petroleum.

Activities

  • Validation of Construction Completion
  • Management of DCS, ESD and F&G System Modifications
  • Developing Commissioning Procedures
  • Conducting Pre-Commissioning Checks
  • Conducting Process Commissioning
  • Conduct Start-up
  • Conducting Process Optimisation
  • Conduct Training

Deliverables

  • DCS & Safety System Modifications
  • Commissioning Procedures
  • Pre-Commissioning Records
  • Commissioning Records
  • Process Optimisation Records
  • Alarm & Trip Records
  • As-Built Documentation
  • Training

Technical specifications

  • 5Km 20” Pipeline between KM & KS
  • Pig launcher, receiver and slug catchers at KM
  • Pig launcher, receiver and slug catchers at KS
  • New ESD and F&G Systems at KM integrating with existing DCS Systems
  • New ESD and F&G Systems at KS integrating with existing DCS Systems
  • 2 Chemical Injection Skids at KM & KS
  • Switchgear Modification at KM & KS
  • Leak Detection System