Project Description & Scope of Work
Description
Dell Server Hardware sizing was done based on future alarms connections to the ProcessVue application software. The Systems was installed in Muscat at Minal Fahal. The application software was installed and configured for a single OPC connector to the remote Qarn Alum production station. Alarms were checked with daily, weekly and KPI reports automatically sent to the local maintenance co-ordinator and Alarms Management Team.
Scope
Provision of ProcessVue an Alarm Management System including the Dell Server Hardware, Application Software and configuration.
- Server Sizing
- Application Sizing
- Application installation & Configuration
- Reports Configuration
- Prepare Systems Design Specification
- Conduct Testing
- Systems Design Specification
- Software Engineering
- Systems Integration
- Systems Implementation
- Testing Plan & Records
- Central Server at PDO Minal Fahal
- 8 OPC Site Connectors
- Connector installed on site OPC server
- Firewall Tunnel configuration to allow alarms routing to server
Project Details
Contract No. | C145 |
---|---|
Industry | Oil & Gas |
Client | Petroleum Development Oman |
Consultant or EPC | None |
Country | Oman |
Primary Service | Alarm Management System |
Secondary Service | None |
Start Date | Jun 2011 |
Person Hours | 270 |
Status | Completed |