PDO Qarn Alam Power Station Phase 3 Commissioning

The power station was a 250MW simple cycle. Our engineers supported PDO in managing the third party interfaces to ensure all the equipment, subsystems and switch boards communicate and function as per specification through DCS system to the central control room.
Our engineers commissioned systems such that they conform to the design specifications in a safe manner. We produce and work to approved commissioning procedures and take accountability for delivery. Our commissioning services have been delivered at the tail end of project construction.

Project Details

  • Contract No. C170
  • Primary Service Construction & Commissioning
  • Industry Oil & Gas
  • Secondary Service As Built Documentation, Commissioning Planning Systemisation & Completion, Pre-Commissioning & Commissioning, Start Up Audit Start Up & Process Optimisation
  • Client Petroleum Development Oman
  • Start Date Apr 2013
  • Consultant or EPC Special Technical Services & Tebodin Bilfinger
  • Contract Value ($) 65600
  • Project Location 74W2+PMH, Qarn Al Alam, Oman
  • Person Hours 850
  • Execution Office Muscat, Sultanate of Oman
  • Status Completed

Scope of work

    Power station commissioning as part of the PDOs commissioning team.

Activities

  • Produce approved commissioning procedures
  • Conducted structured testing methodologies
  • Pre-Commissioning staged witness and acceptation of check sheets
  • Commissioning of systems
  • Conduct Start-up

Deliverables

  • Pre-Commissioning
  • Commissioning
  • Start-up

Technical specifications

  • 250MW Simple Cycle Power Station
  • 2 GE Frame 9E Turbines
  • Yokogawa DCS and IPS systems