Project Description & Scope of Work
Description
Conduct a site survey of all Well Heads and determine the Well Head Control Panels (WHCP) that are not functioning correctly. Prepare a maintenance plan and required spare parts and then repair the panels for optimum performance. Operate the panels conducting regular checks to confirm correct operation. When Spare Parts were not available, old panels were scavenged to make critical WHCP functional.
Scope
Maintenance of Greater Birba Well Head Hydraulic Control Panels
- Conduct Site Survey
- Prepare Maintenance Plan
- Prepare Spare Parts Requirements List and Specifications
- Conduct Flushing, Repairs and Calibration of Instruments
- Operations
- Maintenance
- PDO O&M Procedures
Project Details
Contract No. | C270 |
---|---|
Industry | Oil & Gas |
Client | Petroleum Development Oman |
Consultant or EPC | Worley Parsons Oman |
Country | Oman |
Primary Service | Technical Document Authoring |
Secondary Service | Operations & Maintenance |
Start Date | Feb 2018 |
Person Hours | 4,960 |
Status | In Progress |