PDO Gas CCR Systems Integration

All Local and Regional Gas Control Rooms were unified at the new Gas CCR. All DCS systems Operator screens were collected, analysed and a unified Graphics Philosophy, Functional and Detailed Design documents produced for PDO approval. On approval these were used to develop and implement the unified screens at the new CCR and followed with Operator Training.

Project Details

  • Contract No. C179
  • Primary Service Construction & Commissioning, Detailed Design & Engineering, Implementation
  • Industry Oil & Gas
  • Secondary Service As Built Documentation, Control Systems Engineering, Factory & Site Acceptance Testing, Pre-Commissioning & Commissioning, Projects Plans Procedures Specifications & Detailed Designs, SCADA HMI System Engineering, Start Up Audit Start Up & Process Optimisation, Technical Document Authoring
  • Client Petroleum Development Oman
  • Start Date Feb 2014
  • Consultant or EPC Honeywell Oman
  • Contract Value ($) 520400
  • Project Location Al Fahal Street, Muscat 100, Oman
  • Person Hours 10010
  • Execution Office Muscat, Sultanate of Oman
  • Status Completed

Scope of work

    Development of Level 3 unified Operator Display Screens from Yokogawa, Emerson and Honeywell DCS systems.

Activities

  • Collection of DCS Operator Screens
  • Analysis of existing DCS Operator Screens
  • Development of a Graphics Design Philosophy
  • Development of a Graphics Functional Design Specification
  • Development of a Graphics Detailed Design Specification
  • Development of new screens for each DCS system
  • Implementation & Testing of unified screens
  • Conduct Training

Deliverables

  • Graphics Design Philosophy
  • Graphics Functional Design Specification
  • Graphics Detailed Design Specification
  • New Unified Screens
  • Testing
  • Training

Technical specifications

  • 4 DCS Systems
  • 235 New Unified Screens