Project Description & Scope of Work
Description
PDO decided to upgrade the old Birba Cluster and started with FEED through Imtech and WPAI for PDO. Abalto was awarded the FEED as System Integrator (SI) for the Automation, Control & Instrumentation for the Control and Safety Systems upgrade. We developed a detailed FEED for the upgrade of the legacy DCS and IPS systems by Honeywell and Yokogawa to a new Emerson DeltaV DCS system to examine the best options available and establish the best execution methodology for the upgrade along with a full bill of materials and cost estimates.
Scope
FEED project for the Birba Gathering Station (BGS) Control Systems and Safety Systems Upgrade.
- Develop Project Execution Plan
- Develop Quality Management Plan
- Develop Changeover Plan
- Conduct Site Visit Report and Present to client
- Develop Old CR Equipment Layout
- Develop System Architecture with Demolition
- Develop Bill of Materials
- Develop Project Cost Estimates
- Develop Project Interface Demolition details
- Validate Yokogawa Cabinet Assembly Drawings
- Validate Honeywell Yokogawa Cabinets
- Develop Method Statements & Risk Assessments
- Develop Method Statement of Control Valve Positioners Replacement
- Site Survey
- As Built Documentation
- Front End Engineering & Design
- Philosophies
- Specifications
- Bill of Materials
- Project Planning
- Project Cost Estimates
- Old Yokogawa FastTools SCADA
- Old Yokogawa Stardom FCS
- Old Yokogawa ProSafe IPS
- Old Honeywell DCS
- Old Relay Control Panels
- New Emerson DeltaV DCS
- New HIMA IPS
Project Details
Contract No. | C201 |
---|---|
Industry | Oil & Gas |
Client | Petroleum Development Oman |
Consultant or EPC | Imtech |
Country | Oman |
Primary Service | Front End Engineering & Design |
Secondary Service | Control & Safety Systems Integration |
Start Date | Mar 2015 |
Person Hours | 16,260 |
Status | Completed |