PDO Amal Power Station HRSG Commissioning Management

Amal power station is a 250MW simple cycle using two GE Frame 9E turbines has been constructed by Al-Hassan Engineering in the South Oman region.

We were called back to complete and manage power station completion and commissioning as part of the client’s commissioning team after completion of the HRSG by Nooter/Eriksen.

Our engineers supported PDO in commissioning of the HRSG. We commissioned systems such that they conform to the design specifications in a safe manner. We produce and work to approved commissioning procedures and take accountability for delivery. Our commissioning services have been delivered at the tail end of HRSG construction.

Project Details

  • Contract No. C173
  • Primary Service Construction & Commissioning
  • Industry Oil & Gas
  • Secondary Service As Built Documentation, Commissioning Management, Commissioning Planning Systemisation & Completion, Pre-Commissioning & Commissioning, Start Up Audit Start Up & Process Optimisation
  • Client Petroleum Development Oman
  • Start Date Oct 2013
  • Consultant or EPC Thomassen Services & Contracting Company
  • Contract Value ($) 116000
  • Project Location 8MMM+CMV, Amal, Oman
  • Person Hours 1490
  • Execution Office Muscat, Sultanate of Oman
  • Status Completed

Scope of work

    Complete and manage power station completion and commissioning as part of the client’s commissioning team after completion of HRSG.

Activities

  • Produce approved commissioning procedures
  • Conducted structured phase gate approved commissioning
  • Pre-Commissioning staged witness and acceptation of check sheets
  • Commissioning of systems
  • Conduct Start-up

Deliverables

  • Pre-Commissioning
  • Commissioning
  • Start-up

Technical specifications

  • 250MW Simple Cycle Power Station
  • 2 GE Frame 9E Turbines
  • 1 Nooter/Eriksen HRSH
  • Yokogawa DCS and IPS systems