PDO Amal Power Station Commissioning Phase 2

Amal power station is a 250MW simple cycle using two GE Frame 9E turbines has been constructed by Al-Hassan Engineering in the South Oman region.

Our engineers supported PDO in commissioning of the power station. We commissioned systems such that they conform to the design specifications in a safe manner. We produce and work to approved commissioning procedures and take accountability for delivery. Our commissioning services have been delivered at the tail end of HRSG construction.

Project Details

  • Contract No. C150
  • Primary Service Construction & Commissioning
  • Industry Oil & Gas
  • Secondary Service As Built Documentation, Commissioning Management, Pre-Commissioning & Commissioning, Start Up Audit Start Up & Process Optimisation
  • Client Petroleum Development Oman
  • Start Date Mar 2012
  • Consultant or EPC Thomassen Services & Contracting Company
  • Contract Value ($) 227800
  • Project Location 8MMM+CMV, Amal, Oman
  • Person Hours 2930
  • Execution Office Muscat, Sultanate of Oman
  • Status Completed

Scope of work

    Complete and manage power station completion and commissioning as part of the client’s commissioning team.

Activities

  • Produce approved commissioning procedures
  • Conducted structured testing methodologies
  • Relay Test Engineers testing and validation
  • Pre-Commissioning staged witness and acceptation of check sheets
  • Commissioning of systems
  • Conduct Start-up

Deliverables

  • Pre-Commissioning
  • Commissioning
  • Start-up

Technical specifications

  • 250MW Simple Cycle Power Station
  • 2 GE Frame 9E Turbines
  • Yokogawa DCS and IPS systems