CPECC Sonatrach Refinery Premabergo LPG & Propane Packages Commissioning & Start-up

Premabergo was not able to commission the packages and we were approached to conduct this and provide process guarantees. Our engineers at site found that the PLC and SCADA HMI software application could not be located and hence had to be developed to minimal documentation found in the O&M Manuals. Whilst this was being re-engineers at site our Electrical & Instrumentation Engineer conducted the Pre-Commissioning and Process Commissioning and Start-up.

Project Details

  • Contract No. C064
  • Primary Service Construction & Commissioning, Detailed Design & Engineering, Implementation
  • Industry Oil & Gas
  • Secondary Service Control Systems Engineering, Factory & Site Acceptance Testing, Pre-Commissioning & Commissioning, SCADA HMI System Engineering, Start Up Audit Start Up & Process Optimisation
  • Client Sonatrach
  • Start Date Mar 2019
  • Consultant or EPC China Petroleum Engineering & Construction Corporation (CPECC)
  • Contract Value ($) 250000
  • Project Location Sidi arcine, Baraki, Algeria
  • Person Hours 4100
  • Execution Office Birmingham, United Kingdom
  • Status Completed

Scope of work

    Pre-Commissioning, Commissioning and Start-up of LPG & Propane Dryer Packages.

Activities

  • Re-Develop the PLC Software
  • Re-Design the HMI Screens
  • Conduct Pre-Commissioning Checks
  • Conduct Commissioning

Deliverables

  • PLC Software Re-Development
  • HMI Screens Re-Design
  • Site Acceptance Test Report
  • Pre-Commissioning Check Sheets
  • Alarm & Trip Settings
  • Commissioning Records

Technical specifications

  • 300-M-352 LPG Dryer
  • 300-M-353 Propane Dryer
  • 4 A/B Drying Towers
  • 4 Water Separation
  • 3 Electrical Heater
  • 4 LPG Condenser
  • 4 Propane Condenser
  • 2 Recirculation Pumps
  • 2 Local Control Panels
  • 2 Main Control Panels
  • 200 Inputs/Outputs
  • 2 Siemens S5 PLC
  • 2 Siemens WinCC Panel Mount SCADA