CCED Saiwan Engineering Services

Interface Management during design stage ensuring information provided by vendors to sufficient to construct and commission and identifying issued that require resolution by vendors and CCED the owner.

Project Details

  • Contract No. C147
  • Primary Service Detailed Design & Engineering, Implementation, Management
  • Industry Oil & Gas
  • Secondary Service Control Systems Engineering, Factory & Site Acceptance Testing, Project Management, Projects Plans Procedures Specifications & Detailed Designs, SCADA HMI System Engineering
  • Client CC Energy Development
  • Start Date Sep 2011
  • Consultant or EPC Precision Engineering and Consultancy
  • Contract Value ($) 36300
  • Project Location Oman
  • Person Hours 700
  • Execution Office Muscat, Sultanate of Oman
  • Status Completed

Scope of work

    Provision of Interface Management to assure correct engineering of interfaces by various package vendors for Saiwan and Farha oil fields.

Activities

  • Managing Package procurement and engineering interfaces
  • Packages Interface Management
  • Conducting package witness acceptance tests at vendor’s works

Deliverables

  • Project Interface Management
  • Project Engineering

Technical specifications

  • 4 Separators
  • 4 Heater Treaters with Burner Packages
  • 2 Flare Stacks
  • 2 Control Systems with Siemens DCS & IPS
  • 1 H2S Removal Sulfrox Plant
  • 2 N2 Packages
  • 2 Instrument Utilities Packages
  • 6 Shipping Pumps
  • 2 Analyser Packages