Project Description & Scope of Work
Description
This was a project to design & develop an end to end systems and software solution for the Bromborough Waste Water Treatment Works near Liverpool UK. Processes designed by Degremont and managed by Bechtel for United Utilities for a complete 500 MLD Waste Water Treatment Works.
Scope
System Integration of a complete end-to-end 500 MLD Waste Water Treatment plant from design to commissioning.
- Development of a Control Philosophy
- Development of Functional Design Specification
- Development of Systems Design Specification
- Design site wide Fibre Optics Communications
- PLC, SCADA & HMI Control System Design
- Software Development
- Process Simulation Software Development
- Control Panel Design & Build
- Factory Acceptance Testing
- System Installation Supervision
- Systems Architecture
- Control Philosophy
- Functional Design Specification
- Systems Design Specification
- IO Schedule
- PLC Software
- SCADA & HMI Screens Design
- Factory Acceptance Test Report
- 1,600 Inputs/Outputs
- 8 Allen Bradley 5/60e PLCs
- 2 RS View 32 Hot Standby SCADA Systems
- 8 HMI PanelView 2711 Displays
- Dual redundant fibre optic network
- Rotating Bar Interceptors
- Inlet Screens
- Grit Settlement Bend Variable Speed Drives
- 4 Settlement Tanks
- BAFF Plant Blowers
- 2 Buffer Tanks
- 2 Digesters
- 2 Pathogen Kill Tanks
- 2 Centrifuges
- Odour Control Bed
- Final Effluent Discharge Variable Speed Drives
Project Details
Contract No. | C088 |
---|---|
Industry | Water |
Client | United Utilities |
Consultant or EPC | Purac |
Country | United Kingdom |
Primary Service | Control & Safety Systems Integration |
Secondary Service | Technical Document Authoring |
Start Date | Feb 1999 |
Person Hours | 9,840 |
Status | Completed |