Bromborough PLC & SCADA System Commissioning

Commissioning for a complete 500 MLD Waste Water Treatment Works.

Project Details

  • Contract No. C110
  • Primary Service Construction & Commissioning, Detailed Design & Engineering, Implementation
  • Industry Water Treatment
  • Secondary Service As Built Documentation, Control Systems Engineering, Factory & Site Acceptance Testing, Pre-Commissioning & Commissioning, Projects Plans Procedures Specifications & Detailed Designs, SCADA HMI System Engineering, Start Up Audit Start Up & Process Optimisation
  • Client United Utilities
  • Start Date Jun 2001
  • Consultant or EPC Purac
  • Contract Value ($) 100000
  • Project Location Thornton Park, North Rd, Ellesmere Port, CH65 1AB, United Kingdom
  • Person Hours 3280
  • Execution Office Birmingham, United Kingdom
  • Status Completed

Scope of work

    Commissioning of a complete end-to-end 500 MLD Waste Water Treatment plant.

Activities

  • Site Acceptance Testing
  • Commissioning
  • Conduct Start-up
  • Process Optimisation

Deliverables

  • Site Acceptance Test Report
  • Alarm & Trip Settings
  • Commissioning Records
  • As-Built Documentation
  • Training

Technical specifications

  • 1,600 Inputs/Outputs
  • 8 Allen Bradley 5/60e PLC’s
  • 2 RS View 32 Hot Standby SCADA Systems
  • 8 HMI PanelView 2711 Displays
  • Dual redundant fibre optic network
  • Rotating Bar Interceptors
  • Inlet Screens
  • Grit Settlement Bend Variable Speed Drives
  • 4 Settlement Tanks
  • BAFF Plant Blowers
  • 2 Buffer Tanks
  • 2 Digesters
  • 2 Pathogen Kill Tanks
  • 2 Centrifuges
  • Odour Control Bed
  • Final Effluent Discharge Variable Speed Drives