Bo’ness Waste Water Treatment Works Control Valves Modifications

Modifications to PLC Control System for best process control by conducting PID tuning of all control valves.

Project Details

  • Contract No. C097
  • Primary Service Construction & Commissioning, Detailed Design & Engineering, Implementation
  • Industry Water Treatment
  • Secondary Service As Built Documentation, Control Systems Engineering, Factory & Site Acceptance Testing, Pre-Commissioning & Commissioning, Projects Plans Procedures Specifications & Detailed Designs, SCADA HMI System Engineering, Start Up Audit Start Up & Process Optimisation
  • Client Scottish Water
  • Start Date Aug 2000
  • Consultant or EPC Purac
  • Contract Value ($) 10000
  • Project Location A904 Grangemouth Rd, Bo'ness, EH51 0AZ, United Kingdom
  • Person Hours 330
  • Execution Office Birmingham, United Kingdom
  • Status Completed

Scope of work

    PID Tuning for Control Valves.

Activities

  • Site PLC Software PID Modification
  • Site Testing
  • Commissioning

Deliverables

  • PLC Software Modifications
  • HMI Modifications
  • Process Tuning
  • Commissioning Records

Technical specifications

  • 30 PID Loop Parameter Changes
  • Allen Bradley SLC 500
  • PanelView 800 HMI