Project Description & Scope of Work
Description
Validate and optimise the BAFF Backwash sequences for 8 cells at the Birkenhead Waste Water Treatment Works in the UK. Addition of Inlet pump to increase flow through capacity. PID tuning for Heat Exchange valves for optimum performance and run step change trials. Modify SCADA and PLC systems for status, control and trending. An assortment of other modifications were made to rectify outstanding maintenance issues especially with the Allen Bradley DH+ industrial network.
Scope
Optimise BAFF Backwash sequences. Addition of Inlet pump and tuning Heat Exchange valves.
- PLC & SCADA Control System Modifications
- Site Software Modifications
- Commissioning
- PLC Software
- SCADA Screens Design
- Commissioning Records
- Historical Data Logging
- 50 Inputs/Outputs Added or Changed
- Allen Bradley PLC 5
- Intouch SCADA system
Project Details
Contract No. | C127 |
---|---|
Industry | Water |
Client | United Utilities |
Consultant or EPC | Purac |
Country | United Kingdom |
Primary Service | Control & Safety Systems Integration |
Secondary Service | Commissioning & Start-up |
Start Date | Jun 2003 |
Person Hours | 500 |
Status | Completed |