When our involvement starts at FEED we maintain an integrated design team with the client engineers to guarantee our quality and timely scope delivery.

The Numbers

Executing projects in Control & Automation Systems for over 30 years covering the full life cycle from Concept to Design, Engineering, Contruction, Commissioning, Start-up and Process Optimisation has resulted in diverse experience and us delivering real value to our customers.   We look forward to working with you to delivering your requirements.

8

Total Projects Executed

18330

Total Person Hours

1101900

Total Contracts Value ($)

Abalto take the specifications further in details to produce data sheets utilizing process material balance. When our involvement starts at FEED we maintain an integrated design team with the client engineers to guarantee our quality and timely scope delivery.

To deliver FEED packages, we work closely with our clients and in large projects integrate the client engineers into our engineering team. With this approach the client constantly evaluates and select options, approve the engineering deliverable to maintain their compliance.

Project uncertainties result in inflated execution cost if not managed during FEED, therefore at Abalto with our close client engagement we provide clear specifications and workable FEED packages minimising uncertainty as far as practically possible.

Abalto also provides EPC Tender Document preparation during FEED where the EPC or EPIC scope and deliverable are outlined with minimal uncertainty.

  • Concept Study Technology Investigations
  • Development and Review of Philosophies
  • Develop Process Specifications
  • Develop Discipline Specifications
  • Optimisation of Plot Plan
  • Develop Project Execution Plan
  • Develop Contracting Strategy
  • Develop Project Execution Plan
  • Develop Quality Management Plan
  • Develop Hot Swap Changeover Plan
  • Conduct Site Visit Report and Present to client
  • Provide Inputs to PEFS
  • Develop Equipment Layout
  • Develop System Architecture
  • Develop IO List IO Database
  • Develop Bill of Materials
  • Develop Project Cost Estimates based on FEL3/Class 2
  • Develop Request for Quotation for flotation to EPCs
  • Site Survey
  • As Built Documentation
  • Concept Study
  • Philosophies
  • Process Specifications
  • Discipline Specifications
  • Plot Plan
  • Project Execution Plan
  • Project Planning
  • Bill of Quantities
  • Cost Estimates
  • EPC Flotation RFQ

Projects

  • Land Rover Paint Shop Skid Cleaning Feasibility Study
  • High Pressure Water Skid Clean Control System Specifications
  • Shell Houdini MEG & ERM Plant Safety Systems FEED
  • Perdido GOM Platform Safety System Design
  • Waha FEED Engineering & Management
  • PDO Birba Control Systems Upgrade FEED