CONTROL SYSTEMS

CONSULTANTS DESIGNERS ENGINEERS COMMISSIONING SPECIALISTS STARTUP SPECIALISTS

projects

Filter projects by:

  • Primary Service
  • Secondary Service
  • Industry
  • Client
  • Status
  • ApplyReset

Sort projects by:

  • 285projects executed
  • 1149122person hours
  • 47719966contracts value ($)

FEED Services for Lower Zakum LTDP-1 EPS-2 and PDP Project

ConsultancyMar 2023
Provision of Chairman for P&ID Reviews and Value Engineering Workshops

Redundant Equipment Demolition Detailed Design

Construction & Commissioning, Detailed Design & EngineeringDec 2022
Redundant Assets DPS, BBS Demolition Design

Senior Commissioning Engineer, Technicians & Operators

Construction & CommissioningFeb 2023
Site Manpower Services

Salalah Methanol Electrical, Instrumentation & Telecom E&F Area

Construction & CommissioningJun 2019
Salalah liquefied petroleum gas (SLPG) project is being developed in Dhofar, southern Oman, by Oman

Multi Discipline Engineering Services

Construction & Commissioning, Detailed Design & EngineeringJan 2023
Manpower Provision for Discipline Engineers

Engineering & Technical Support Services

Detailed Design & EngineeringOct 2022
Control & Automation Engineering Services

Review RHIP Alarms Variable Table

Consultancy, ImplementationSep 2022
Alarm Rationalisation

Senior Commissioning Engineer

Construction & CommissioningAug 2022
Provision of Senior Commissioning Engineer

RETRO HAZOP Review

Consultancy, Detailed Design & EngineeringSep 2022
RETRO HAZOP Review

Control Systems Review Study

Consultancy, Detailed Design & EngineeringAug 2022
Control Systems Review Study

Duqm Refinery Commissioning

Construction & CommissioningJul 2022
Manpower Provision for: Commissioning Engineer Commissioning Technician

Instrument Air Systems Adequacy Check

Construction & Commissioning, Detailed Design & EngineeringJul 2022
Instrument Air Systems Adequacy Check

Tender-27 Daleel Stations 3D Modelling PDMS

Construction & Commissioning, Detailed Design & EngineeringJul 2022
Daleel Stations 3D Modelling

Supply of Manpower (OQ Project)

Construction & CommissioningJun 2022
Manpower Provision for: E&I Technician Electrical Technician Instrument Technician

Preparation of Method Statement MPP3 Project

Construction & CommissioningJul 2022
Commissioning method statement

Tibra Red Lined Markup PEFS

Construction & Commissioning, Detailed Design & EngineeringJun 2022
Red Line Markup PEFS for Tibr Haushi Development Project Phase 2A

Greater Birba Station Operators

Construction & CommissioningJun 2022
Greater Birba Station Operators

Daleel Tender-28 Asset Registry

Construction & Commissioning, Detailed Design & EngineeringFeb 2022
Asset Register development for New Burners Replacement at DPS Project.

Senior Commissioning Engineer

Construction & CommissioningNov 2021
Senior Commissioning engineer

Detailed Design for Existing WI pumps & EOT crane rectification

Detailed Design & EngineeringSep 2021
Detailed Design for Existing WI Pumps & EOT crane rectification

Haima West FLD Development

Detailed Design & EngineeringJun 2021
▪ FCS & IPS Logic in FLDs

Daleel Commissioning Engineer

Construction & CommissioningJun 2021
Commissioning engineer services of additional separation project

PDO Marmul Manpower Supply for Permit Holders

Construction & CommissioningApr 2021
Instrument & Electrical Permit Holders

Sayyala, Suwaihat & Rima Pipeline As-Built

Construction & CommissioningJun 2021
As-Built for pipelines including RLMU checks

AOTC Instrument Technicians for OQ LPG Project

Construction & CommissioningJun 2021
Manpower supply for Construction & Commissioning

SNC Manpower

Construction & CommissioningMay 2021
Manpower supply for Construction, Commissioning & Start-up

PDO Fahud Gas Compression-RLMU

Detailed Design & EngineeringJun 2021
PDMS As-Built work and carry out SPI ASB for 2017-040 Fahud Gas Compression including RLMU checks

Daleel Tender 21 Asset Registry

Construction & Commissioning, Detailed Design & EngineeringMay 2021
Asset Register development for AP/LP Flare, Test Separators & Dehydration Tanks Pumps.

Worley Dhulaima-B Development Project

Detailed Design & EngineeringApr 2021
ELMU at Lekhwair Area for Dhulaima-B Development Project. RLMU for PEFS at Dhulaima Field as part o

Daleel Tender-17 FCP DD work

Detailed Design & EngineeringFeb 2022
Detailed Design (DD) for 9 different FCP's as combine in one Project. 1. DPS Saver Drain Pit Modific

Daleel Tender 18 Asset Registry & As-Built

Construction & CommissioningFeb 2021
Generation of templates including Asset templates, Attribute templates, BOM templates, and Maintenan

Daleel Tender 16 Commissioning Services

Construction & Commissioning, Detailed Design & EngineeringFeb 2021
Commissioning Services for additional separation train project (E-1782)

PDO As-Built & Manpower Call of Rates

Construction & CommissioningJan 2021
PDO FEED Office Engineering & Services support Sub-Contract Services for As-Built in scope of work,

Commissioning documents for Mamul MMPS Availability Enhancement Project

Construction & Commissioning, Detailed Design & EngineeringJan 2021
Preparation of Commissioning documents for Mamul site SMES 200073E MMPS Availability Enhancement Pro

PDO Fahud Gas Compression-RLMU

Construction & CommissioningDec 2020
SRF 561 Fahud Gas Compression Red Line Mark Up Verification

PDO Nimr E Polymer Spare Parts

Construction & CommissioningNov 2020
Nimr E Polymer Injection Facility various equipment Spare Parts Supply

Daleel Site Survey

Construction & Commissioning, Detailed Design & EngineeringNov 2020
Conduct a site survey and verify that all site equipment is captured on Master Drawings, producing M

Marmul GCP Flare Project

Construction & CommissioningNov 2020
Preparation of Commissioning Documents for MAMRUL MMGCP Flare Project

GGP Rejuvenation Project RLMU As-Built

Construction & CommissioningNov 2020
GGP Rejuvenation including Site Survey, Red Line Mark Up (RLMU) Development, As-Built and CAD develo

Daleel Commissioning Engineer

Construction & Commissioning, Detailed Design & EngineeringNov 2020
DPS AP/LP Flare Replacement Project Commissioning Support

Raba & Hana FLD Development

Detailed Design & EngineeringOct 2020
SRF-512 RABA Field Development including FEED & Detailed Design for C&A

Alarm Rationalisation

Consultancy, Detailed Design & Engineering, ImplementationSep 2020
Alarm Rationalization - Design Facilitator Design & Engineering Services ZPTE176 for OLNG PP

Tender 7 Provision of Senior Designers

Consultancy, Detailed Design & EngineeringJun 2020
Professional Services for Process, Civil, Mechanical, Electrical & Instrumentation Engineering to su

PDO Sakhar As-Built Documentation

Construction & CommissioningJun 2020
Greater Taliah Phase 3 (Sakhar) As-Built

Modernization of Control Room

Construction & Commissioning, Detailed Design & EngineeringSep 2020
Design, Engineering, demolition, installation, commissioning & startup with parallel operations for

Oman LNG Systemisation

Construction & Commissioning, Detailed Design & EngineeringMay 2020
Preparation of Commissioning & Startup deliverables including Procedures, Plans and completions.

E&I for Salalah Methanol and Ammonia Plant

Construction & CommissioningApr 2020
Manpower supply for Construction & Commissioning

PDO MOV replacement project

Construction & CommissioningApr 2020
RLMU MOV Replacement

Daleel Radiations Dispersion Analysis

Consultancy, Detailed Design & EngineeringMar 2020
Radiation Dispersion Analysis

PDO Marmul Sarmad LPO Commissioning

Construction & Commissioning, Detailed Design & EngineeringJan 2020
Marmul Sarmad LPO Commissioning documentation

Birba Manifold Safeguarding & Flare Upgrade

Construction & Commissioning, Detailed Design & EngineeringFeb 2020
Birba Manifold Safeguarding & Flare Upgrade

PDO As-Built Amal 2A West Project

Construction & CommissioningMar 2020
Amal 2A West-Re-routing and Demolition of Cold Producers

Daleel Provision for Engineering Services and Consultancy Support for 3 years

Consultancy, Detailed Design & EngineeringApr 2020
Professional Services for Process, Civil, Mechanical, Electrical & Instrumentation Engineering to su

InnovateQ – Nibras Documentation

Detailed Design & EngineeringDec 2019
Preparation of technical documentation for PDO Production Management Software System

BEC Demolition Projects D&E Stations CTR

Construction & Commissioning, Detailed Design & EngineeringDec 2019
Preparation of project specific Commissioning deliverables including Procedures, Plans and completio

PDO SNCP As-Built

Construction & CommissioningNov 2019
Preparation of As-Built drawings inline with PDO standard procedures for 3D modelling & SPI

Manpower for Tayseer EDF OPS Activities

Construction & CommissioningOct 2019
Operation & Maintenance Assistance

Harweel New F&G Commissioning Deliverables

Construction & Commissioning, Detailed Design & EngineeringApr 2020
Preparation of project specific Commissioning deliverables including Procedures, Plans and completio

Cambridge Viscometer Commissioning Deliverables

Construction & Commissioning, Detailed Design & EngineeringSep 2019
Preparation of project specific Commissioning deliverables including Procedures, Plans and completio

Oil Tanks Commissioning Deliverables

Construction & Commissioning, Detailed Design & EngineeringSep 2019
Preparation of project specific Commissioning deliverables including Procedures, Plans and completio

Yibal Khuff E&I On Plot

Construction & CommissioningSep 2019
Manpower supply for Construction & Commissioning

AER Cyber Security Report

Consultancy, Detailed Design & EngineeringJul 2019
Assessment of compliance to ARE Critical Infrastructure Standard and ISO 27001 Company standard

SLPG Manpower Supply

Construction & CommissioningAug 2019
Manpower supply for commissioning

FCP Project CTRs Systemization work

Construction & Commissioning, Detailed Design & EngineeringMar 2019
Preparation of project specific Commissioning deliverables including Procedures, Plans and completio

PDO Camp Substation Commissioning

Construction & Commissioning, Detailed Design & EngineeringJan 2019
Preparation of project specific Commissioning deliverables including Procedures, Plans and completio

PDO Greater Birba Well Head Hydraulic Control Panel Maintenance Technicians Team

Construction & CommissioningFeb 2018
Conduct a site survey of all Well Heads and determine the Well Head Control Panels (WHCP) that are n

PDO Birba Alarm Management Rationalisation

Consultancy, ImplementationMay 2018
PDO engaged us to implement the previously rationalised alarms by liaising with the systems vendor.

PDO Marmul Fire Fighting Commissioning Projects

Construction & Commissioning, Detailed Design & EngineeringAug 2018
Preparation of project specific Commissioning deliverables including Procedures, Plans and completio

PDO Marmul MMA GRC Project Commissioning Deliverables

Construction & Commissioning, Detailed Design & EngineeringAug 2018
Preparation of project specific Commissioning deliverables including Procedures, Plans and completio

PDO Harweel Fire & Gas Design Review Facilitator

Consultancy, Detailed Design & EngineeringJul 2018
Our PDO approved TA2 consultant participated in a design review for assurance that the project desig

PDO Birba Changeover Site Activities

Construction & CommissioningMay 2018
PDO decided to upgrade the old Birba Cluster and started with a FEED and Detailed Design done by Aba

PDO Integrated Oil Control Centre Systems Integration FEED

Consultancy, Detailed Design & EngineeringMay 2017
Petroleum Development Oman, (Company), intends to build a new Integrated Operations Centre (IOC) at

Salalah IPP Metering Stations

Construction & CommissioningAug 2017
Preparation of project specific Commissioning Procedures following OGC Commissioning & Start-up Proc

PDO Amal Solar Off Plot Phase 1C Alarm Management Rationalisation

Consultancy, ImplementationSep 2017
PDO engaged us to implement the previously rationalised alarms by liaising with the systems vendor.

Salalah Methanol Company Control Room Upgrade Phase 1

Construction & CommissioningMay 2018
Installation of Control & Automation System for SMC new control room including Lighting, Desks, Cabl

PDO Al Huwaisa As-Built Documentation

Construction & CommissioningApr 2018
Preparation of As-Built drawings inline with PDO standard procedures Develop design drawings require

PDO Birba Rejuvenation Commissioning Deliverables

Construction & Commissioning, Detailed Design & EngineeringAug 2017
Preparation of project specific Commissioning deliverables including Procedures, Plans and completio

PDO Qaharir Site Commissioning Control Room Upgrade Project

Construction & Commissioning, Detailed Design & EngineeringAug 2017
Preparation of project specific Commissioning deliverables including Procedures, Plans and completio

PDO Marmul Rationalization Project Commissioning

Construction & Commissioning, Detailed Design & EngineeringAug 2017
Preparation of project specific Commissioning deliverables including Procedures, Plans and completio

PDO GHN Alarm Management Rationalisation

Consultancy, ImplementationMar 2018
PDO engaged us to implement the previously rationalised alarms by liaising with the systems vendor.

PDO SNCP Alarm Management Rationalisation

Consultancy, ImplementationMar 2018
PDO engaged us to implement the previously rationalised alarms by liaising with the systems vendor.

PDO GGP Rejuvenation As-Built Documentation

Construction & CommissioningFeb 2018
Preparation of As-built drawings inline with PDO standard procedures Develop design drawings require

PDO Ghaba North Alarm Management Rationalisation, Variable Table Conversion, Suppression & Verification

Consultancy, ImplementationOct 2017
A team of 6 engineers conducted the Alarm Rationalisation, Variable Table Conversion, Suppression &

PDO Real Time Operations Well Test Systems Documentation

Detailed Design & EngineeringAug 2017
Collect all existing documentation for well testing and create a document contents structure followe

Oman Gas Company Commissioning

Construction & CommissioningAug 2017
Preparation of project specific Commissioning Procedures following OGC Commissioning & Start-up Proc

PDO Al Noor Control Room Upgrade Human Factors Engineering Design Review

ConsultancyJan 2018
Our PDO approved Human Factors Engineering Facilitator & Scribe conducted a design review for assura

PDO Yibal Rejuvenation Project Alarm Rationalisation

Consultancy, ImplementationDec 2017
PDO engaged us to implement the previously rationalised alarms by liaising with the systems vendor.

PDO Amal HRSG 1C Alarm Management Rationalisation & Variable Table Conversion

Consultancy, ImplementationMay 2018
PDO engaged us to do a Variable Table Conversion and implement the rationalised alarms by liaising w

PDO Al-Noor Rationalisation Facilitation

Consultancy, ImplementationNov 2017
Our PDO Approved Alarm Management Facilitator conducted a design review for assurance that the proje

Daleel Polymer Injection Skid Commissioning, Operations & Maintenance Team 1 Year Contract

Construction & Commissioning, Operations & MaintenanceDec 2017
Manage the skid connections, followed by commissioning and operations at site. Maintenance challenge

PDO Al-Noor EPCC Alarm Rationalisation

Consultancy, ImplementationNov 2017
PDO engaged us to implement the previously rationalised alarms by liaising with the systems vendor.

PDO CRM Pre & Commissioning EI&C Team

Construction & CommissioningOct 2017
The plants which were modernized were the Saih Nihayda Gas Plant (SNGP) and the Saih Rawl Central Pr

PDO Marmul Central Control Room Construction Support Services

Construction & CommissioningOct 2017
Building a modern new Marmul Central Control Room to be the central control location for all marmul

PDO Marmul Central Control Room Construction Support Services

Construction & CommissioningOct 2017
Building a modern new Marmul Central Control Room to be the central control location for all marmul

PDO Marmul MMPS Gas Compression Buildings Commissioning Procedures

Construction & Commissioning, Detailed Design & EngineeringAug 2017
Preparation of project specific Commissioning deliverables including Procedures, Plans and completio

PDO FEED Office Control, Instrumentation & Automation Team 2 Year Contract

Consultancy, Detailed Design & EngineeringJun 2017
Preparation of a various C&I&A FEED Deliverables for several projects.

PDO SNCP Commissioning C&I Team

Construction & CommissioningJun 2017
The Saih Nihayda condensate stabilization plant will be built near the Saih Nihayda gas plant in the

BP Khazan CPF Commissioning C&I Team

Construction & CommissioningMay 2017
Located on a previously undeveloped desert site 350 kilometres south of Muscat, work on the Khazzan

Qatar Petroleum NGL-2 De-Commissioning

Construction & Commissioning, Detailed Design & EngineeringMay 2017
Preparation of De-Commissioning Risks Matrix, de-commissioning procedures and check lists and conduc

PDO Amal HRSG 1C Alarm Rationalisation

Consultancy, ImplementationMay 2017
PDO engaged us to implement the previously rationalised alarms by liaising with the systems vendor.

PDO Harweel 2AB Alarm Rationalisation

Consultancy, ImplementationMar 2017
PDO engaged us to implement the previously rationalised alarms by liaising with the systems vendor.

PDO Glass Point Solar Steam Phase 2 Commissioning

Construction & CommissioningApr 2017
Check all control, automation and instrumentation with pre-commissioning check sheets and commission

PDO BWLL On Plot Alarm Rationalisation

Consultancy, ImplementationMar 2017
PDO engaged us to implement the previously rationalised alarms by liaising with the systems vendor.

Cyber Security OT IT Interfaces Report

Consultancy, Detailed Design & EngineeringMar 2017
Conduct site survey and conduct a Cyber Security Assessment of the Operational Technologies (OT) and

ORPIC Sohar Refinery Improvement Project Ozone Instrumentation As-Built Data Sheets

Construction & CommissioningFeb 2017
Site survey to capture all Instruments Tag and serial numbers followed by search for Data Sheets and

Qatar Shell Pearl GTL C&I Manpower Supply Services

Construction & Commissioning, Detailed Design & EngineeringMar 2017
Download all project logic, conduct conversions to new firmware software revisions, validate and upl

ORPIC Aromatics Control Room Shutdown

Construction & CommissioningFeb 2017
Relocate 4 control panels including the addition of junction boxes and extension power and instrumen

PDO Marmul Pump Replacement Commissioning Procedures & Planning

Construction & Commissioning, Detailed Design & EngineeringMar 2017
Preparation of project specific Commissioning deliverables including Procedures, Plans and completio

LPIC EPC3 Control & Automation Design Review

ConsultancyNov 2016
Our PDO approved TA2 consultant participated in a design review for assurance that the project desig

PDO KDC-2 Human Factors Engineering Design Review

ConsultancyJul 2016
Our PDO approved Human Factors Engineering Facilitator & Scribe conducted a design review for assura

PDO SNDC-2 Human Factors Engineering Design Review

ConsultancyJul 2016
Our PDO approved Human Factors Engineering Facilitator & Scribe conducted a design review for assura

PDO Rabab Harweel Integrated Power Station Alarm Rationalisation

Consultancy, ImplementationMay 2016
PDO engaged us to implement the previously rationalised alarms by liaising with the systems vendor.

PDO Natih C&A and New Electrical Substation Upgrade Human Factors Engineering Design Review

ConsultancyApr 2016
Our PDO approved Human Factors Engineering Facilitator & Scribe conducted a design review for assura

PDO Yibal Khuff Alarm Rationalisation

Consultancy, ImplementationMar 2016
PDO engaged us to implement the previously rationalised alarms by liaising with the systems vendor.

PDO Amal Steam Alarm Rationalisation

Consultancy, ImplementationFeb 2016
PDO engaged us to implement the previously rationalised alarms by liaising with the systems vendor.

PDO Musallim Human Factors Engineering Design Review

ConsultancyDec 2015
Our PDO approved Human Factors Engineering Facilitator & Scribe conducted a design review for assura

PDO Alarm Facilitation Services Blanket 1 Year Contract

Consultancy, ImplementationDec 2015
A team of 6 engineers conducted the Alarm Rationalisation, Variable Table Conversion, Suppression &

PDO Alarm Rationalisation Guideline GU513 Update

Consultancy, Detailed Design & EngineeringNov 2015
Update of the PDO GU-513 - Guidelines for Alarm Management and Rationalisation to incorporate curren

PDO Birba Control Systems Revamp Detailed Design

Construction & Commissioning, Detailed Design & EngineeringJul 2016
PDO decided to upgrade the old Birba Cluster and started with FEED that was done by Abalto through I

ORPIC Sohar Refinery Improvement Project (SRIP) Package 3 & 5 C&I Construction & Commissioning

Construction & CommissioningNov 2015
The Sohar Refinery Improvement Project (SRIP) is a multi-billion dollar project for Oman Oil Refiner

PDO Real Time Operations Nibras Documentation

Detailed Design & EngineeringSep 2015
Collect all existing documentation for Nibras and create a documents contents structure followed by

PDO Main Automation Contract Framework Governance Procedure Documentation

Detailed Design & EngineeringSep 2015
Description of the governance of the Main Automation Contractor (MAC) Agreements including Local Agr

Qatar Petroleum Feed Stream Integration & Fiscal Metering Systems Installation Feed Stream Integration Commissioning

Construction & CommissioningSep 2015
A 2 part project for supervising the pre-commissioning activities and responsible for safe Commissio

Qatar Shell Pearl GTL PAS & ENMCS Systems Upgrade

Construction & Commissioning, Detailed Design & EngineeringSep 2015
Download all project logic, conduct conversions to new firmware software revisions, validate and upl

PDO Marmul Area Completions & Commissioning Services

Construction & CommissioningAug 2015
Commissioning Completions, Commissioning and Start-up for Several projects in the PDO Marmul Area co

PDO Training & Template Creation for Alarm Rationalisation

Consultancy, ImplementationMar 2015
PDO engaged us to implement the previously rationalised alarms by liaising with the systems vendor.

PDO Ghaba North Alarm Rationalisation

Consultancy, ImplementationMay 2015
PDO engaged us to implement the previously rationalised alarms by liaising with the systems vendor.

Oman LNG IMAC Replacement with Process Vue Alarm Management System

ImplementationMay 2015
Dell Server Hardware sizing was done based on future alarms connections to the Process Vue applicati

PDO SR CPP & GGP Alarm Rationalisation

ImplementationApr 2015
PDO engaged us to implement the previously rationalised alarms by liaising with the systems vendor.

Qatar Petroleum Khatiya Main to Khatiya South 20 Inch Pipeline Commissioning

Construction & CommissioningMay 2015
The objective of this project was to provide a new 20” Wet Gas bi-directional Pipeline between KM

PDO Natih Produced Water Pumps Replacement Alarm Rationalisation

Consultancy, ImplementationMay 2015
PDO engaged us to implement the previously rationalised alarms by liaising with the systems vendor.

PDO Completions System Control & Instrumentation Check Sheet Update

Construction & Commissioning, Detailed Design & EngineeringMar 2015
Update of the Control & Instrumentation Check Sheets to incorporate new types of control instrumenta

PDO Amal Steam Phase 1C Human Factors Engineering Design Review

ConsultancyMar 2015
Our PDO approved Human Factors Engineering Facilitator & Scribe conducted a design review for assura

PDO Amal Power Station HRSG Commissioning

Construction & CommissioningDec 2014
Amal power station is a 250MW simple cycle using two GE Frame 9E turbines has been constructed by Al

PDO Birba Control Systems Upgrade FEED

Consultancy, Detailed Design & EngineeringMar 2015
PDO decided to upgrade the old Birba Cluster and started with FEED through Imtech and WPAI for PDO.

PDO Saih Rawl Pre-Filter Coalescer Human Factors Engineering Design Review

ConsultancyMar 2015
Our PDO approved Human Factors Engineering Facilitator & Scribe conducted a design review for assura

OOCEP Abu Tabul Commissioning Management

Construction & CommissioningJan 2015
Preparation of project specific Commissioning Planning and management of commissioning teams followi

PDO Gas CCR Contract Management

ManagementDec 2014
Manage scope, delivery and variations of the project to invoice correctly and expedite payment. In a

OOMCO Retail Systems Automation Contract Management

ManagementDec 2014
A major contract for the automation of all Oman Oil Filling Stations such that all station tank fill

Oman Gas Company Alarm Philosophy & Rationalisation

Consultancy, ImplementationDec 2014
PDO engaged us to develop an Alarms Philosophy and implement the previously rationalised alarms by l

PDO Yibal NOCS Pumps Upgrade Alarm Rationalisation

Consultancy, ImplementationOct 2014
PDO engaged us to implement the previously rationalised alarms by liaising with the systems vendor.

PRO Services

ManagementOct 2014
Applications to Ministry of Labour for Construction Work Permits

PDO Process Vue Alarm Management Software Support

ImplementationOct 2014
Verification of correct hardware and software clients and server application functioning.

PDO Yibal A FWKO Pump Alarm Rationalisation

Consultancy, ImplementationSep 2014
PDO engaged us to implement the previously rationalised alarms by liaising with the systems vendor.

PDO Raba Harweel Power Human Factors Engineering Design Review

ConsultancyJan 2015
Our PDO approved Human Factors Engineering Facilitator & Scribe conducted a design review for assura

Project Administration Assistance

Construction & Commissioning, ManagementSep 2014
Organising project technical files and reports for project expenditure against budgets.

Venezuela Smithco Air Coolers Commissioning

Construction & CommissioningAug 2014
Commissioning and Start-up for Air Coolers at refinery.

PDO Yibal Rejuvenation Project Human Factors Engineering Design Review

ConsultancyAug 2014
Our PDO approved Human Factors Engineering Facilitator & Scribe conducted a design review for assura

PDO Zauliyah Pre-Start-up Audit

Construction & CommissioningJul 2014
Our PDO approved TA2 consultant participated in a Pre Start-up Audit (PSUA) for assurance that the p

OOCEP Abu Tabul Commissioning Management

Construction & CommissioningJun 2014
Confirm Mechanical Completion and then follow Pre-Commissioning Check Sheets.

PDO Upper Shuaiba Select Phase Human Factors Engineering Design Review

ConsultancyJan 2015
Our PDO approved Human Factors Engineering Facilitator & Scribe conducted a design review for assura

Qatar Petroleum Burn Pit Migration Commissioning

Construction & CommissioningMay 2014
Preparation of Commissioning Risks Matrix, systemisation, commissioning procedures, pre-commissionin

PDO Thulailat & Marmul Area Alarm Management Facilitation

ConsultancyJun 2014
Our PDO Approved Alarm Management Facilitator conducted a design review for assurance that the proje

PDO Qarn Alam Power Station Pre-Start-up Audit

Construction & CommissioningApr 2014
Our PDO approved TA2 consultant participated in a Pre Start-up Audit (PSUA) for assurance that the p

PDO Saih Rawl CPP Flare Gas Recovery Unit Human Factors Engineering Design Review

ConsultancyMar 2014
Our PDO approved Human Factors Engineering Facilitator & Scribe conducted a design review for assura

PDO Gas CCR Systems Integration

Construction & Commissioning, Detailed Design & Engineering, ImplementationFeb 2014
All Local and Regional Gas Control Rooms were unified at the new Gas CCR. All DCS systems Operator s

PDO Nimr E Polymer Contract Management

ManagementJun 2014
Collect all historical communication with client to determine the scope of variations and PDO approv

PDO Zauliyah Gas Plant Human Factors Engineering Design Review

ConsultancyJan 2014
Our PDO approved Human Factors Engineering Facilitator & Scribe conducted a design review for assura

PDO Yibal Y3DC 3rd Stage Depletion Human Factors Engineering Design Review

ConsultancyDec 2013
Our PDO approved Human Factors Engineering Facilitator & Scribe conducted a design review for assura

PDO Saih Niyada Condensate Stabilization Alarm Management Facilitation

ConsultancyDec 2013
Our PDO Approved Alarm Management Facilitator conducted a design review for assurance that the proje

PDO Real Time Operations Well Test FDS Documentation

Detailed Design & EngineeringOct 2013
Conduct a Gap Analysis workshop with Real Time Operations (RTO) stakeholders to determine the scope

PDO Amal Power Station HRSG Commissioning Management

Construction & CommissioningOct 2013
Amal power station is a 250MW simple cycle using two GE Frame 9E turbines has been constructed by Al

PDO Nimr KW Alarm Rationalisation

Consultancy, ImplementationAug 2013
PDO engaged us to implement the previously rationalised alarms by liaising with the systems vendor.

PDO Lekhwair Combined Cycle Power Station Design Review

ConsultancyJun 2013
Our PDO approved TA2 consultant participated in a design review for assurance that the project desig

PDO Qarn Alam Power Station Phase 3 Commissioning

Construction & CommissioningApr 2013
The power station was a 250MW simple cycle. Our engineers supported PDO in managing the third party

PDO Nimr Polymer Commissioning & Start-up

Construction & CommissioningJul 2013
PDO built a new Polymer Injection Trial Facility at Nimr-E for Polymer Flood Trials in the Nimr E oi

PDO Amin Water Injection Human Factors Engineering Design Review

ConsultancyApr 2013
Our PDO approved Human Factors Engineering Facilitator & Scribe conducted a design review for assura

PDO Minal Fahal Process Vue Alarm Management System Version Upgrade

ImplementationApr 2014
The application software on server and clients was upgraded.

PDO Rabab Harwell Integrated (RHI) Commissioning & Start-up Services

Construction & CommissioningSep 2013
The project was to further develop the high pressure reservoirs to yield 110,000 bbl/d through misci

PDO Commissioning Systemisation, Commissioning Completion & Commissioning 2 Year Contract

Construction & Commissioning, Detailed Design & EngineeringMar 2013
Several projects document inputs were collected and Commissioning Systemisation conducted with prepa

OOCEP Musandam Gas Processing Plant Commissioning Procedures

Construction & Commissioning, Detailed Design & EngineeringMar 2013
Preparation of project specific Buildings Commissioning Procedures.

PDO Ghaba North Human Factors Engineering Design Review

ConsultancyMar 2013
Our PDO approved Human Factors Engineering Facilitator & Scribe conducted a design review for assura

PDO DACA Cyber Security Upgrades

Construction & Commissioning, Consultancy, Detailed Design & EngineeringJun 2013
Follow PDO specific DCADA System Hardening measures for all Control Systems Servers, Operator and En

PDO Amal Steam Trials Pre-Start-up Audit

Construction & CommissioningDec 2012
Our PDO approved TA2 consultant participated in a Pre Start-up Audit (PSUA) for assurance that the p

PDO SNGP Human Factors Engineering Design Review

ConsultancyNov 2012
Our PDO approved Human Factors Engineering Facilitator & Scribe conducted a design review for assura

PDO Marmul GNR Pump Commissioning Procedure

Construction & CommissioningOct 2012
Preparation of project specific Commissioning Procedures following PDO PR 1159 Commissioning & Start

PDO Yibal Compression Human Factors Engineering Design Review

ConsultancySep 2012
Our PDO approved Human Factors Engineering Facilitator & Scribe conducted a design review for assura

PDO Rabab Harwell Integrated (RHI) Manning Strategy

Consultancy, Detailed Design & EngineeringSep 2012
Consult with client and establish the project plan and determine manning levels based on systems, un

PDO Rabab Harwell Integrated (RHI) Power Station & HRSG Design Review

Consultancy, Detailed Design & EngineeringJul 2013
Our PDO approved TA2 consultant participated in a design review for assurance that the project desig

PDO Harweel 2AB C&A Commissioning

Construction & CommissioningJun 2012
The project was to further develop the high pressure reservoirs to yield 110,000 bbl/d through misci

PDO Rabab Harwell Integrated (RHI) Competency Development Philosophy and Assurance Plan

Consultancy, Detailed Design & EngineeringMay 2012
Consult with client and establish the project plan and comparable manpower utilisation from similar

PDO Marmul Process Vue Alarm Management System OPC Connections

ImplementationJun 2013
Application software modifications to configure a single OPC connector to the remote Marmul producti

PDO Thulayat Alarm Rationalisation

Consultancy, ImplementationFeb 2013
PDO engaged us to implement the previously rationalised alarms by liaising with the systems vendor.

PDO Qarn Alum Power Station Commissioning Phase 1 & 2

Construction & CommissioningApr 2012
The power station was a 250MW simple cycle. Our engineers supported PDO in managing the third party

PDO Amal Power Station Commissioning Phase 2

Construction & CommissioningMar 2012
Amal power station is a 250MW simple cycle using two GE Frame 9E turbines has been constructed by Al

PDO Amal Power Station Commissioning Phase 1

Construction & CommissioningApr 2011
The power station was a 250MW simple cycle. Our engineers supported PDO in managing the third party

CCED Saiwan Engineering Services

Construction & Commissioning, ImplementationNov 2011
The project was split into an Early Development Facility where long term production testing can be i

CCED Saiwan Engineering Services

Detailed Design & Engineering, Implementation, ManagementSep 2011
Interface Management during design stage ensuring information provided by vendors to sufficient to c

PDO Amal Power Station Alarm Management Implementation Phase 2

ImplementationNov 2011
PDO engaged us to implement the previously rationalised alarms by liaising with the systems vendor.

PDO Qarn Alum Process Vue Alarm Management System Trail

ImplementationJun 2011
Dell Server Hardware sizing was done based on future alarms connections to the Process Vue applicati

PDO Amal Power Station Alarm Management Implementation Phase 1

ImplementationJun 2011
PDO engaged us to implement the previously rationalised alarms by liaising with the systems vendor.

LISI Market Report

Detailed Design & Engineering, ManagementJan 2011
Market research was conducted on Oman electricity regulator 5 year plan, major operators, and EPCs c

PDO Amal Power Station Alarm Management Rationalisation

Consultancy, ImplementationApr 2011
PDO engaged us for the assurance that the project control system was delivered according to ISA18.2,

PDO Yibal Plant Alarm Management Facilitation & Audit

Consultancy, ImplementationDec 2010
Our PDO Approved Alarm Management Facilitator conducted a design review for assurance that the proje

Qatar Petroleum Filter Commissioning

Construction & CommissioningApr 2010
Abalto safely and successfully delivered commissioning procedures, conducted process commissioning a

Waha FEED Engineering & Management

Consultancy, ManagementFeb 2010
As Project Manager responsible for SNC-Lavalin JV interests at the FEED project office including cli

AGIP Kashaghan Pipeline

Construction & Commissioning, Detailed Design & Engineering, ManagementJun 2009
Project management of PMSC team located in Saipem’s Spa office in Milan to ensure Electrical and C

SABIC Saudi Kayan Phenolics DCS, Safety System

Detailed Design & Engineering, ManagementJan 2007
Deliver of Project Management for Phenol plant producing 245 KTPA of phenol and 150 KTPA of acetone

Perdido GOM Platform Safety System Design

Consultancy, Detailed Design & EngineeringMar 2006
During the Front End Engineering & Design (FEED) phase the assumptions and conclusions of the pre-FE

Shell Houdini MEG & ERM Plant Safety Systems FEED

Consultancy, Detailed Design & EngineeringJun 2005
During the Front End Engineering & Design (FEED) phase the assumptions and conclusions of the pre-FE

Qatar Petroleum GTC 189/ED/03 EPIC of an independent Flare for QJA-1 & 2 and Replacement Separators at Dukhan Fields

Construction & Commissioning, Detailed Design & EngineeringApr 2005
Abalto safely and successfully delivered commissioning procedures, conducted process commissioning a

BP Bruce Safety Systems Hot Changeover Strategy

Detailed Design & Engineering, ImplementationJan 2005
Development of Yokogawa DCS and ProSafe IPS for Offshore Platform Hot Changeover FAT, SAT, Site Cons

PDO Harweel EDF DCS & Safety Systems Commissioning, Start-up and Optimisation.

Construction & Commissioning, Detailed Design & EngineeringJan 2004
Harweel Early Development Facility (EDF) project was a USD 100 Million project for Petroleum Develop

Saudi Aramco Offshore Safety, RTU & SCADA System Factory Acceptance Testing

Construction & Commissioning, Detailed Design & Engineering, ImplementationDec 2003
Wiring and set up of all RTU and Safety control panels and SCADA system followed by IO and functiona

Scanning Power Transmission Contracts & Maps

Construction & Commissioning, Detailed Design & EngineeringNov 2003
Bar Code IDs attached to each of the 2,000,000 archived contracts followed by bulk scanning, uploadi

Pringles Production Control & Automation System

Construction & Commissioning, Detailed Design & EngineeringOct 2003
Develop a complete control & automation system including PLC, SCADA and distributed VSD drive transp

Schlumberger Wire Line Tool Communication System

Construction & Commissioning, Detailed Design & Engineering, ImplementationJun 2003
Develop software in Visual Basic embedded in PC based RS232 communication module for a Wire Line Too

Birkenhead BAFF Wash Plant Control System Upgrades

Construction & Commissioning, Detailed Design & EngineeringJun 2003
Validate and optimise the BAFF Backwash sequences for 8 cells at the Birkenhead Waste Water Treatmen

Stingray Sub Sea Power Generation Pilot Plant Control System on-site Engineering & Commissioning

Construction & Commissioning, Detailed Design & EngineeringMay 2003
Modifications to PLC and SCADA software for control of hydrofoil angel to optimise power generation.

Waste Water Treatment Works Sustainability Control System Upgrade

Construction & Commissioning, Detailed Design & Engineering, ImplementationApr 2003
Modifications to PLC Control System to include closed loop control for control valves.

Klampress Filtrate Control System

Construction & Commissioning, Detailed Design & Engineering, ImplementationOct 2002
Develop PLC control system software for a Klampress Filtrate Press including interlocks, interfacing

Chelmsford Sludge Pasteurisation Plant Control & Automation System Engineering, Commissioning & Start-up

Construction & Commissioning, Detailed Design & Engineering, ImplementationSep 2002
Control system and software design and development for a continuous batch process control of Sludge

Bromborough Remediation Control System Upgrade

Construction & Commissioning, Detailed Design & EngineeringAug 2002
Modifications to PLC Control System for best process control by conducting PID tuning of BAFF Plant

Bedford Imported Sludge Control System Upgrade

Construction & Commissioning, Detailed Design & Engineering, ImplementationAug 2002
Modifications to the control sequences for decanting imported sludge.

Great Billing Sludge Pasteurisation Plant Control & Automation System Engineering, Commissioning & Start-up

Construction & Commissioning, Detailed Design & Engineering, ImplementationJul 2002
Control system and software design and development for a continuous batch process control of Sludge

Bedford Sludge Pasteurisation Plant Control & Automation System Engineering, Commissioning & Start-up

Construction & Commissioning, Detailed Design & Engineering, ImplementationJun 2002
Control system and software design and development for a continuous batch process control of Sludge

Pernton & Newton SatCon Control System Communication Interfaces Modifications

Construction & Commissioning, Detailed Design & EngineeringMay 2002
Modifications to PLC control system communication module to send equipment status to SCADA

Cliff Quay Sludge Pasteurisation Plant Control & Automation System Engineering, Commissioning & Start-up

Construction & Commissioning, Detailed Design & Engineering, ImplementationApr 2002
Control system and software design and development for a continuous batch process control of Sludge

Replacement of Paint Spray Booth Baffles

Construction & CommissioningMar 2002
Replacement of Paint Spray Booth Baffles and modifications to Control System including air flow moni

Cambridge Sludge Pasteurisation Plant Control & Automation System Engineering, Commissioning & Start-up

Construction & Commissioning, Detailed Design & Engineering, ImplementationMar 2002
Control system and software design and development for a continuous batch process control of Sludge

Skid Body Transport to Storage Upgrades

Construction & Commissioning, Detailed Design & EngineeringFeb 2002
Modifications to control system for Skid Body Transport to Storage including counting, Skid Identifi

Relocate Hoist Rail & Control System

Construction & Commissioning, Detailed Design & EngineeringJan 2002
Modifications to the controls for relocation of Hoist Rail Transport System including safety interlo

Caister Sludge Pasteurisation Plant Control & Automation System Engineering, Commissioning & Start-up

Construction & Commissioning, Detailed Design & Engineering, ImplementationJan 2002
Control system and software design and development for a continuous batch process control of Sludge

Chelmsford Imported Sludge Control System

Construction & Commissioning, Detailed Design & Engineering, ImplementationNov 2001
Modifications to the control sequences for decanting imported sludge.

Bromborough PLC & SCADA System Commissioning

Construction & Commissioning, Detailed Design & Engineering, ImplementationJun 2001
Commissioning for a complete 500 MLD Waste Water Treatment Works.

Spray Booth Effluent Treatment Plant Control System Upgrade

Construction & Commissioning, Detailed Design & Engineering, ImplementationJun 2001
Modifications to PLC controls for the Spray Booth Effluent Treatment Plant Purge and Back Wash Cycle

Kings Lynn Waste Water Treatment Works Control & Automation System

Construction & Commissioning, Detailed Design & Engineering, ImplementationMay 2001
Modification of SCADA scripts to make communications robust. Failure in field communications wiring

Design and Development of Project Document Management System Phase 2

Detailed Design & EngineeringMay 2001
Development of search, retrieval and viewing all project design and construction documents.

West Mersey Waste Water Treatment Works Control & Automation System

Construction & Commissioning, Detailed Design & EngineeringApr 2001
Modifications to PLC Control System for best process control by conducting PID tuning of BAFF Plant

Design and Development of Project Document Management System Phase 1

Detailed Design & EngineeringApr 2001
Development of a 5 level structured Tag based Database for organising and storing all project design

King Lynn Waste Water Treatment Works Pulsed Xenon Ultraviolet Plant Control System

Construction & Commissioning, Detailed Design & Engineering, ImplementationMar 2001
Development of a control system for safeguard against cryptosporidium outbreaks using pulsed Xenon U

Chelmsford Waste Water Treatment Works SCADA System Upgrades

Construction & Commissioning, Detailed Design & Engineering, ImplementationMar 2001
Modify SCADA reports to client requirement to show and print daily, weekly and monthly production to

Spray Booth Drip Trays Control Systems Modifications

Construction & Commissioning, Detailed Design & EngineeringMar 2001
Modifications to the control systems for Drip Trays water cleaning systems for trickle and forced wa

Intumescent Paint Spray Booth Automation & Control System Upgrade

Construction & Commissioning, Detailed Design & Engineering, ImplementationMar 2001
Modifications to the Control & Automation System for Intumescent Paint Spray Booth for loading, entr

Newhaven Waste Water Treatment Works PICs Process Simulation System

Construction & Commissioning, Detailed Design & Engineering, ImplementationFeb 2001
Using P&IDs and process narrative Process Flow Charts were created which were then used to do the so

Pulsed Xenon Ultraviolet Pilot Plant Control System

Construction & Commissioning, Detailed Design & Engineering, ImplementationJan 2001
Development of a control system for safeguard against cryptosporidium outbreaks using pulsed Xenon U

Intumescent Paint Spray Booth Automation & Control System Commissioning & Start-up

Construction & Commissioning, Detailed Design & Engineering, ImplementationSep 2000
Installation of Control & Automation System for Intumescent Paint Spray Booth with loading, entry an

Bo’ness Waste Water Treatment Works Control Valves Modifications

Construction & Commissioning, Detailed Design & Engineering, ImplementationAug 2000
Modifications to PLC Control System for best process control by conducting PID tuning of all control

Underseal Spray Deck Modification to Control System

Construction & Commissioning, Detailed Design & Engineering, ImplementationJul 2000
Modifications to PLC Control System for an Wax Underseal Spray Deck to accommodate new car underbody

Waste & Water Treatment Works Design Specifications

Detailed Design & EngineeringJul 2000
Writing a detailed Functional & Systems Design Specification, PLC software functions and SCADA Scree

High Pressure Water Skid Clean Control System Specifications

Consultancy, Detailed Design & EngineeringJun 2000
Development of detailed design specifications for the control system for the high pressure water jet

Exit to Audit Spur Control System Upgrade

Construction & Commissioning, Detailed Design & EngineeringMay 2000
Modifications to the PLC Control System Track Change Exit to Audit Spur with the addition of positio

Infra Red Oven Protection Control System

Construction & Commissioning, Detailed Design & EngineeringApr 2000
Modifications to the PLC Control System for Infra Red Oven protection by the addition of F&G Heat De

Cotton Valley Waste Water Treatment Works Control & Automation System

Construction & Commissioning, Detailed Design & EngineeringMar 2000
Modifications to the control system for a Waste Water Treatment Works including Buffer Tanks, Digest

Land Rover Paint Shop Skid Cleaning Feasibility Study & Report

Consultancy, Detailed Design & EngineeringFeb 2000
The feasibility report involved the search for technologies that would remove 100% of the loose and

Kawasaki Heavy Industries Tunnel Boring Machine Control System for Canary Wharf River Thames Crossing

Construction & Commissioning, Detailed Design & EngineeringJul 1999
Development of a PLC and HMI Control System for a Tunnel Boring Machine with controls for the Cutter

Bromborough Waste Water Treatment Works Control & Automation System

Construction & Commissioning, Detailed Design & EngineeringFeb 1999
This was a project to design & develop an end to end systems and software solution for the Bromborou

Wuxi Water Treatment Works Control & Automation System

Construction & Commissioning, Detailed Design & Engineering, ImplementationOct 1998
Specify, design, build the control system from User Requirements Specification for the end to end co

Harwich Waste Water Treatment Works Control & Automation System

Construction & Commissioning, Detailed Design & Engineering, ImplementationMay 1998
Modifications to the control system for a Waste Water Treatment Works including Buffer Tanks, Digest

Chelmsford Waste Water Treatment Works Control & Automation System

Construction & Commissioning, Detailed Design & Engineering, ImplementationApr 1998
Provision of a complete control system for the process control including Rotating Bar Interceptors,

Track Shoes Heat Treatment Furnaces Control & Automation System

Construction & Commissioning, Detailed Design & EngineeringFeb 1998
Provision of a full control & automation system for 2 Caterpillar Track Shoe Heat Treatment Furnaces

Kia Motors Reciprocator Paint Spray Booths

Construction & Commissioning, Detailed Design & EngineeringJan 1998
Development of PLC & SCADA control system for 2 Reciprocating Robots and Spray Booths water and air

Toyota Derby Junior Paint Mix Room control system modifications

Construction & Commissioning, Detailed Design & EngineeringJul 1997
Modifications control system for Air Handling and Mixing Systems in the Junior Paint Mix Room in Toy

Liuzhou Water Treatment Works Control & Automation System

Construction & Commissioning, Detailed Design & Engineering, ImplementationMar 1997
Control and automation systems including PLCs and SCADA systems delivered from client P&IDs and PFDs

Coventry Paint Booth Control System Upgrade

Construction & Commissioning, Detailed Design & EngineeringMar 1997
Upgrade of the PLC Control System for Colour Change Flushing sequences in Paint Booth at Renault in

Coleshill Waste Water Treatment Works Control System Upgrade

Construction & Commissioning, Detailed Design & Engineering, ImplementationFeb 1997
Upgrade the control system for timed control of Limitorque de-sludging valves with status feedback t

Coleshill Waste Water Treatment Works Control System

Construction & Commissioning, Detailed Design & Engineering, ImplementationApr 1996
Upgrade the PLC control for the addition of level controls to sludge pits pumping system.

Worchester Waste Water Treatment Works Control System Upgrade

Construction & Commissioning, Detailed Design & Engineering, ImplementationMar 1996
Upgrade the PLC Control for the addition of effluent tanks decanting values and level transmitters.

Gypsum Production Control System

Construction & Commissioning, Detailed Design & EngineeringJun 1995
Development of an automated Production Control System for Gypsum Boards with mixers, formers, Drying

Intumescent Paint Spray Booth Automation & Control System

Construction & Commissioning, Detailed Design & EngineeringApr 1995
Development of a Control & Automation System for Intumescent Paint Spray Booth with loading, entry a

Chocolate Shells Mixing Temperature Control System

Construction & Commissioning, Detailed Design & EngineeringJun 1994
Modifications to Allen Bradley 1769 PLC control software for temperature control of chocolate mixing

Actuator Control Communication System

Construction & Commissioning, Detailed Design & EngineeringFeb 1994
Development of a software using Visual Basic for a communication system for configuring and status f

Paint Shop and Mix Room Control System

Construction & Commissioning, Detailed Design & Engineering, ImplementationAug 1993
Full Paint Shop and Mix Room Control System including Paint Mix Room and 2 full Paint Lines.

BASS Brewers New Control & Automation System

Construction & Commissioning, Detailed Design & Engineering, ImplementationAug 1993
Batch production system for a brewery control & automation system for wort production, fermentation

Mayonnaise Mixer Automation

Construction & Commissioning, Detailed Design & EngineeringJun 1993
Modifications to PLC software for High Speed Mayonnaise Mixer interlocked with upstream ingredients

Radiator Heat Treatment Control System

Construction & Commissioning, Detailed Design & EngineeringMar 1993
Automation of welding, heat treatment, cooling, water fill and pressure testing with PLC & SCADA con

Oven Door Replacement Control System

Construction & Commissioning, Detailed Design & EngineeringFeb 1993
Modifications to PLC software Oven door replacement interlocked with track movement and fire detecti

Laboratory Information Management System Software Translation

Detailed Design & EngineeringJul 1992
Enhancement of a Laboratory Information Management system for effectively manage patient enrolment,

Nuclear Fuel Rod Testing Robot

Detailed Design & EngineeringMay 1992
PLC software development using Minder software typicals & testing for BNFL Nuclear Fuel Rod Testing

Tooks Automated Dough Mixers

Construction & Commissioning, Detailed Design & Engineering, ImplementationOct 1991
PLC and SCADA control system for High Speed Automated Dough Mixers with recipes manager batching & c

CPECC Sonatrach Refinery Premabergo LPG & Propane Packages Commissioning & Start-up

Construction & Commissioning, Detailed Design & Engineering, ImplementationMar 2019
Premabergo was not able to commission the packages and we were approached to conduct this and provid

Roberts Automated Dough Mixers

Construction & Commissioning, Detailed Design & Engineering, ImplementationAug 1991
PLC and SCADA control system for High Speed Automated Dough Mixers with recipes manager batching & c

Manbrot Automated Dough Mixers

Construction & Commissioning, Detailed Design & Engineering, ImplementationJul 1991
PLC and SCADA control system for High Speed Automated Dough Mixers with recipes manager batching & c

Bokomo Automated Dough Mixers

Construction & Commissioning, Detailed Design & Engineering, ImplementationMay 1991
PLC and SCADA control system for High Speed Automated Dough Mixers with recipes manager batching & c

Automated Dough Mixers

Construction & Commissioning, Detailed Design & Engineering, ImplementationMar 1991
Writing a detailed Functional & Systems Design Specification, PLC software and SCADA screen Typicals

Re-Bar Bender 3

Construction & Commissioning, Detailed Design & Engineering, ImplementationDec 1990
Control panel design and software development and the build of control panel and cabling installatio

Shear Line 2

Construction & Commissioning, Detailed Design & Engineering, ImplementationNov 1990
Control panel design and software development and the build of control panel and cabling installatio

Re-Bar Bender 2

Construction & Commissioning, Detailed Design & Engineering, ImplementationAug 1990
Control panel design and software development and the build of control panel and cabling installatio

Shear Line 1

Construction & Commissioning, Detailed Design & Engineering, ImplementationJun 1990
Control panel design and software development and the build of control panel and cabling installatio

Re-Bar Bender 1

Construction & Commissioning, Detailed Design & Engineering, ImplementationApr 1990
Control panel design and software development and the build of control panel and cabling installatio

TheatreTech China Control & Automation System

Construction & Commissioning, Detailed Design & EngineeringFeb 1989
A project to complete the construction and commissioning for 2 performing arts theatres in Shenzhen

Binks Bullows Mini Paint Booth

Construction & Commissioning, Detailed Design & Engineering, ImplementationFeb 1988
Development of PLC control software for a mini paint spray booth for temperature and air flow contro

Rover Longbridge Chiller Control System

Construction & Commissioning, Detailed Design & EngineeringNov 1987
Refurbishment of chiller temperature control where chilled water was used for a pint mix room temper

Nissan Paint Shop Refurbishment

Construction & Commissioning, Detailed Design & Engineering, ImplementationAug 1987
Refurbishment of Derby plant paint shop to control colour selection, flow and pressure for delivery

Paint Mix Room Control System

Construction & Commissioning, Detailed Design & Engineering, ImplementationJun 1987
Paint mix room control of temperature, flow and pressure including colour change control for deliver

why abalto

Diverse Experience

We provide project design, engineering, project management, construction, commissioning and start-up services mainly for Oil & Gas projects.

Systems Integration

We provide our customers with the opportunity to deploy integrated control systems solutions tailored to your needs to delivering solutions to your exact requirements.

Rising to Challenges

We rise to challenges with a Can Do attitude so please Consider it Solved... Consider it Done!This is our ethos.